Original source · versioned page text
M1717 - OPW12-0095 GIA Cover letter.pdf
.
On 28 January 2016 Council approved a change to the development approval to reduce the number of proposed villas by
four, alter the proposed villa types and ancillary uses with the inclusion of a manager’s residence. The amendments
resulted in a combined site cover of 20,945m2 and a GFA of 19,575m2, both less than originally approved.
There have been a number of minor changes to the Development Approval (MCU) since the original approval was
granted, with the most recent change to this approval issued by Council by correspondence dated 24 February 2021
(Council Ref: 132004.5744.11). The most recent change to Approval specifically sought to relocate the 20 car parking
spaces for Building B, towards the front boundary on Eenie Creek Road. This revised location reflects the position and
number as previously approved by the original Approval issued 2005. The revised layout has also been designed to reflect
the existing layout approved as part of Building A.
2.0 DESRIPTION OF PROPOSAL
In recognition of the most recent change to the higher order MCU Approval (Council Ref. 132004.5744.11), we note that
the approved operational works (OPW) plans need to be amended to reflect the changes to the approved development
layout. Accordingly, we have updated the set of approved OPW plans, specific to Stage 5, to incorporate the changes
sought by this request. To assist Council’s assessment of the request, consequential changes to the list of approved plans
are highlighted below via strikeout for deletions and bold-type for new inclusions.
Plan No. Rev. Plan Name Date
M1717E5 L01 A Construction Staging Plan, prepared by JFP Consulting Engineers 28/02/18
M1717E5 L02 A Existing Services and Site Survey Plan, prepared by JFP Consulting 28/02/18
Engineers
M1717E5 EW01 AC Earthworks Layout Plan, prepared by JFP Consulting Engineers 28/02/1804/05/18
M1717E5 EW02 AB Earthworks Details Plan, prepared by JFP Consulting Engineers 28/02/1827/04/18
M1717E5 R01 AD Roadworks Layout Plan, prepared by JFP Consulting Engineers 28/02/1808/06/21
M1717E5 R02 A Roadworks Details Plan, prepared by JFP Consulting Engineers 28/02/18
M1717E5 R03 AF Roadworks Intersection Details Plan, prepared by JFP Consulting 28/02/1808/06/21
Engineers
M1717E5 R04 A Roadworks Longitudinal and Typical Cross Sections – Swallow Street, 28/02/18
prepared by JFP Consulting Engineers
M1717E5 R05 A Roadworks Cross Sections – Swallow Street, prepared by JFP 28/02/18
Consulting Engineers
M1717E5 R06 AB Roadworks Longitudinal and Cross Sections – Blue Gum Street, 28/02/1810/01/20
prepared by JFP Consulting Engineers
M1717E5 R07 A Roadworks Cross Sections – Blue Gum Street, prepared by JFP 28/02/18
Consulting Engineers
M1717E5 R08 AB Roadworks Longitudinal and Cross Sections – Silver Gull Boulevard, 28/02/1827/04/18
prepared by JFP Consulting Engineers
M1717E5 R09 A Roadworks Details, prepared by JFP Consulting Engineers 28/02/18
M1717E5 D01 AD Drainage Catchment Plan, prepared by JFP Consulting Engineers 28/02/1804/06/18
M1717E5 D02 AD Drainage Layout Plan, prepared by JFP Consulting Engineers 28/02/1804/06/18
M1717E5 D03 AC Drainage Longitudinal Sections, prepared by JFP Consulting Engineers 28/02/1804/06/18
M1717E5 D04 AC Drainage Calculation Table, prepared by JFP Consulting Engineers 28/02/1804/06/18
JFP Ref: M1717 Page 2
[OCR of page images]
On 28 January 2016 Council approved a change to the development approval to reduce the number of proposed villas by
four, alter the proposed villa types and ancillary uses with the inclusion of a manager’s residence. The amendments
resulted in a combined site cover of 20,945m2 and a GFA of 19,575m2, both less than originally approved.
There have been a number of minor changes to the Development Approval (MCU) since the original approval was
granted, with the most recent change to this approval issued by Council by correspondence dated 24 February 2021
(Council Ref: 132004.5744.11). The most recent change to Approval specifically sought to relocate the 20 car parking
spaces for Building B, towards the front boundary on Eenie Creek Road. This revised location reflects the position and
number as previously approved by the original Approval issued 2005. The revised layout has also been designed to reflect
the existing layout approved as part of Building A.
In recognition of the most recent change to the higher order MCU Approval (Council Ref. 132004.5744.11), we note that
the approved operational works (OPW) plans need to be amended to reflect the changes to the approved development
layout. Accordingly, we have updated the set of approved OPW plans, specific to Stage 5, to incorporate the changes
sought by this request. To assist Council’s assessment of the request, consequential changes to the list of approved plans
are highlighted below via strikeout for deletions and bold-type for new inclusions.
Plan No. Rev. Plan Name DF} a=)
M1717E5 LO1 A Construction Staging Plan, prepared by JFP Consulting Engineers 28/02/18
M1717E5 LO2 A Existing Services and Site Survey Plan, prepared by JFP Consulting 28/02/18
Engineers
M1717E5 EWO1 | AC Earthworks Layout Plan, prepared by JFP Consulting Engineers 28/02/1804/05/18
M1717E5 EWO2 | AB Earthworks Details Plan, prepared by JFP Consulting Engineers 28/02/4827/04/18
M1717E5 RO1 AD Roadworks Layout Plan, prepared by JFP Consulting Engineers 28/02/1808/06/21
M1717E5 RO2 A Roadworks Details Plan, prepared by JFP Consulting Engineers 28/02/18
M1717E5 RO3 AF Roadworks Intersection Details Plan, prepared by JFP Consulting 28/02/4808/06/21
Engineers
M1717E5 RO4 A Roadworks Longitudinal and Typical Cross Sections — Swallow Street, 28/02/18
prepared by JFP Consulting Engineers
M1717E5 ROS A Roadworks Cross Sections — Swallow Street, prepared by JFP 28/02/18
Consulting Engineers
M1717E5 RO6 AB Roadworks Longitudinal and Cross Sections — Blue Gum Street, 28/02/1810/01/99
prepared by JFP Consulting Engineers
M1717E5 RO7 A Roadworks Cross Sections — Blue Gum Street, prepared by JFP 28/02/18
Consulting Engineers
M1717E5 RO8 AB Roadworks Longitudinal and Cross Sections — Silver Gull Boulevard, 28/02/4827/04/18
prepared by JFP Consulting Engineers
M1717E5 RO9 A Roadworks Details, prepared by JFP Consulting Engineers 28/02/18
M1717E5 DO1 AD Drainage Catchment Plan, prepared by JFP Consulting Engineers 28/02/1804/06/18
M1717E5 DO2 AD Drainage Layout Plan, prepared by JFP Consulting Engineers 28/02/1804/06/18
M1717E5 DO3 AC Drainage Longitudinal Sections, prepared by JFP Consulting Engineers | 28/02/4804/06/18
M1717E5 DO4_ =| AC Drainage Calculation Table, prepared by JFP Consulting Engineers 28/02/1804/06/18
JFP Ref: M1717
Page 2
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (M1717 - OPW12-0095 GIA Cover letter.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.