Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

M1717 - OPW12-0095 GIA Cover letter.pdf

of 3

Page text read automatically using OCR, there may be inaccuracies

.




    M1717E5 E01         AB        Erosion and Sediment Control Layout Plan, prepared by JFP              28/02/1827/04/18
                                  Consulting Engineers
    M1717E5 E02         A         Erosion and Sediment Control Details, prepared by JFP Consulting       28/02/18
                                  Engineers
    M1717E5 S01         AB        Sewer Reticulation Layout Plan, prepared by JFP Consulting Engineers   28/02/1827/04/18
    M1717E5 S02         AB        Sewer Reticulation Details, prepared by JFP Consulting Engineers       28/02/1827/04/18
    M1717E5 S03         AB        Sewer Longitudinal Section, prepared by JFP Consulting Engineers       28/02/1827/04/18

In view of the minor nature of the proposed plan changes, which have been undertaken to align with recently approved
changes to the higher order MCU Approval, we request Council’s written confirmation that the enclosed plans are
‘generally in accordance’ with the approved Operational Works package. This will then allow our client to continue with
construction of the final stage of the development.

We can confirm that Generally in Accordance fee of $631.00 will be paid upon receipt of the payment advice from
Council.

If you require further information, please do not hesitate to contact our office.




Yours faithfully,




TIMOTHY BALCOMBE
SENIOR PLANNER
JFP URBAN CONSULTANTS PTY LTD

Encl:     Amended Civil Plans, prepared by JFP Urban Consultants

CC:       Country Club Villages




JFP Ref: M1717                                                                                                  Page 3


[OCR of page images]
 

 

 

 

 

 

 

 

M1717E5 E01 AB Erosion and Sediment Control Layout Plan, prepared by JFP 28/02/1827/04/18
Consulting Engineers

M1717E5 E02 A Erosion and Sediment Control Details, prepared by JFP Consulting 28/02/18
Engineers

M1717E5 S01 AB Sewer Reticulation Layout Plan, prepared by JFP Consulting Engineers | 28/02/4827/04/18

M1717E5 S02 AB Sewer Reticulation Details, prepared by JFP Consulting Engineers 28/02/1827/04/18

M1717E5 S03 AB Sewer Longitudinal Section, prepared by JFP Consulting Engineers 28/02/1827/04/18

 

 

In view of the minor nature of the proposed plan changes, which have been undertaken to align with recently approved

changes to the higher order MCU Approval, we request Council’s written confirmation that the enclosed plans are

‘generally in accordance’ with the approved Operational Works package. This will then allow our client to continue with

construction of the final stage of the development.

We can confirm that Generally in Accordance fee of $631.00 will be paid upon receipt of the payment advice from

Council.

If you require further information, please do not hesitate to contact our office.

Yours faithfully,

/

| ahrortee

TIMOTHY BALCOMBE

SENIOR PLANNER

JFP URBAN CONSULTANTS PTY LTD

Encl: Amended Civil Plans, prepared by JFP Urban Consultants

cc: Country Club Villages

JFP Ref: M1717

Page 3

 

Log in to download the original (M1717 - OPW12-0095 GIA Cover letter.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.