M1717 - OPW12-0095 GIA Cover letter.pdf
.
M1717E5 E01 AB Erosion and Sediment Control Layout Plan, prepared by JFP 28/02/1827/04/18
Consulting Engineers
M1717E5 E02 A Erosion and Sediment Control Details, prepared by JFP Consulting 28/02/18
Engineers
M1717E5 S01 AB Sewer Reticulation Layout Plan, prepared by JFP Consulting Engineers 28/02/1827/04/18
M1717E5 S02 AB Sewer Reticulation Details, prepared by JFP Consulting Engineers 28/02/1827/04/18
M1717E5 S03 AB Sewer Longitudinal Section, prepared by JFP Consulting Engineers 28/02/1827/04/18
In view of the minor nature of the proposed plan changes, which have been undertaken to align with recently approved
changes to the higher order MCU Approval, we request Council’s written confirmation that the enclosed plans are
‘generally in accordance’ with the approved Operational Works package. This will then allow our client to continue with
construction of the final stage of the development.
We can confirm that Generally in Accordance fee of $631.00 will be paid upon receipt of the payment advice from
Council.
If you require further information, please do not hesitate to contact our office.
Yours faithfully,
TIMOTHY BALCOMBE
SENIOR PLANNER
JFP URBAN CONSULTANTS PTY LTD
Encl: Amended Civil Plans, prepared by JFP Urban Consultants
CC: Country Club Villages
JFP Ref: M1717 Page 3
[OCR of page images]
M1717E5 E01 AB Erosion and Sediment Control Layout Plan, prepared by JFP 28/02/1827/04/18
Consulting Engineers
M1717E5 E02 A Erosion and Sediment Control Details, prepared by JFP Consulting 28/02/18
Engineers
M1717E5 S01 AB Sewer Reticulation Layout Plan, prepared by JFP Consulting Engineers | 28/02/4827/04/18
M1717E5 S02 AB Sewer Reticulation Details, prepared by JFP Consulting Engineers 28/02/1827/04/18
M1717E5 S03 AB Sewer Longitudinal Section, prepared by JFP Consulting Engineers 28/02/1827/04/18
In view of the minor nature of the proposed plan changes, which have been undertaken to align with recently approved
changes to the higher order MCU Approval, we request Council’s written confirmation that the enclosed plans are
‘generally in accordance’ with the approved Operational Works package. This will then allow our client to continue with
construction of the final stage of the development.
We can confirm that Generally in Accordance fee of $631.00 will be paid upon receipt of the payment advice from
Council.
If you require further information, please do not hesitate to contact our office.
Yours faithfully,
/
| ahrortee
TIMOTHY BALCOMBE
SENIOR PLANNER
JFP URBAN CONSULTANTS PTY LTD
Encl: Amended Civil Plans, prepared by JFP Urban Consultants
cc: Country Club Villages
JFP Ref: M1717
Page 3
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (M1717 - OPW12-0095 GIA Cover letter.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.