Delegated Report - Code - Planning OPW24 0025 · OPW24/0025

of 15

Text shows just the words. Original shows the document exactly as it was published.

                           QE-01       Final    Environmental Assessment Report                 15 August 2022
                                                Prepared by Fox & Co. Environmental

                           -           -        Riparian Rehabilitation Plan                    -
                                                Prepared by Equilibrium Ecology

                           -           1        Bushfire Hazard Assessment                      31 August 2022
                                                Prepared by Equilibrium Ecology

                           -           1        Bushfire Evacuation Plan                        26 January 2024
                                                Prepared by Equilibrium Ecology

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 7 May 2026, unless an application to extend the currency period is
                      approved by Council.
               SITE SPECIFIC CONDITIONS
                      Bonds
               3.     A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     Prior to the prestart meeting for the rehabilitation works, a bank guarantee or a bond of
                      $10,000 must be lodged as security for the completion of the rehabilitation works and three-
                      year performance maintenance period identified in the conditions of this approval.
               5.     Bonds must:
                      a.       have approval of the bond calculations and amount from Council prior to lodgement;
                      b.       be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      c.       be requested for release by writing to Council, when relevant approval requirements
                               have been met.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               6.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               8.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               9.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.       Civil engineering works;
                      b.       Landscape works;

                                                                                                      Page 6 of 15

Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW24 0025.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.