Delegated Report - Code - Planning OPW24 0025 · OPW24/0025
QE-01 Final Environmental Assessment Report 15 August 2022
Prepared by Fox & Co. Environmental
- - Riparian Rehabilitation Plan -
Prepared by Equilibrium Ecology
- 1 Bushfire Hazard Assessment 31 August 2022
Prepared by Equilibrium Ecology
- 1 Bushfire Evacuation Plan 26 January 2024
Prepared by Equilibrium Ecology
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 7 May 2026, unless an application to extend the currency period is
approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Prior to the prestart meeting for the rehabilitation works, a bank guarantee or a bond of
$10,000 must be lodged as security for the completion of the rehabilitation works and three-
year performance maintenance period identified in the conditions of this approval.
5. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
7. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
8. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
9. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
Page 6 of 15
Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.