Delegated Report - Code - Planning OPW24 0025 · OPW24/0025

of 15

Text shows just the words. Original shows the document exactly as it was published.

                      c.      Erosion and sediment control works; and
                      d.      Other relevant parties.
               10.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               11.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               12.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Retention of Existing Trees and Vegetation
               13.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
                      Fauna Management
                      A qualified person* must be engaged to manage fauna prior and during clearing to:
                      a.      Ensure works are carried out in accordance with the approved Environmental
                              Assessment Report; and the Nature Conservation Act 1992.
                      b.      Undertake pre-clearing inspections including fauna relocation and removal or blocking
                              of all vacant hollows.
                      c.      Ensure clearing works avoids nesting times of animals and birds.
                      d.      Provide a written report to Council with the request for the prestart meeting of all pre-
                              clearing activities and initiatives.
                      e.      Co-ordinate staging and sequence of clearing with fauna protection.
                      f.      Protect and recover fauna during clearing operations (fauna not previously removed).
                      g.      Manage the translocation of animals and recovery procedures in accordance with
                              relevant legislation.
                      h.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Plant Pest Management
               14.    A qualified person* must manage plant pest (weeds) to:
                      a.      Ensure plants listed as Class 1, 2 declared pests and environmental weeds within
                              Council’s Pest Management Plan are controlled and prevented from spreading.
                      b.      Oversee management techniques that minimise regrowth, prevent damage to non-
                              target species, retain conservation values and maintains site stability.
                      *(Refer to Advisory Note)
                      Land Rehabilitation


                                                                                                         Page 7 of 15

Document Set ID: 23004687
Version: 5, Version Date: 09/05/2024

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW24 0025.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.