Original source · versioned page text
2017-08-14 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 14 AUGUST 2018
d. Ensure all sanitary conveniences are constructed to ensure privacy to the
satisfaction of an authorized person; and
e. Ensure shower facilities are installed:
i. With separate drainage points for the discharge of water into the drainage
system; and
ii. In a separate compartment or cubicle which is constructed to ensure
privacy to the satisfaction of an authorized person; and
f. Provide for suitable laundry facilities including laundry tubs, washing machines
and clothes lines in a centrally located area; and
g. Provide sewage or a drainage system in conformity with the requirements of the
local government for the carrying off and disposal of all wastes from every water
closet fixture, urinal, ablutionary facility, laundry facility and site; and
h. Provide waste water disposal points throughout the site which are:
i. Provided with a water stand pipe; and
ii. Provided with an impervious paved area measuring not less than 1m x 1m
and graded to a central drainage inlet which is connected to sewage or
drainage system.
Retention of Existing Trees
6. Existing trees on the site and in the road reserve must be assessed by a qualified
arborist and retained and protected where possible. Where mature trees are to be
removed, reasonable grounds must be given by the qualified arborist. Any tree
removed must be replaced with a similar suitable tree species in a similar location,
where practicable.as part of the restoration of the overall site.
7. In order to protect existing vegetation and natural habitat values, waste water must not
be disposed of on-site and must be collected and appropriately treated or disposed of
off-site.
8. Pest plant species, including “Undesirable species” as listed in Planning Scheme Policy
3 Landscaping Plants and Guidelines and Noosa Council’s Pest Management Plan as
amended from time to time, must be controlled on site.
Bushfire and Natural Hazards
9. The development must be carried out in accordance with section 6 of the Bushfire Risk
Assessment and Bushfire Risk Management Plan for the Noosa North Shore Beach
Campground Upgrade Revision 1 March 2017 prepared by Ecological Natural Area
Management.
10. A copy of the Bushfire Risk Assessment and Bushfire Risk Management Plan for the
Noosa North Shore Beach Campground Upgrade Revision 1 March 2017 prepared by
Ecological Natural Area Management must be provided to the nearest fire authority.
11. The development must be carried out in accordance with the Bushfire Risk Assessment
and Bushfire Risk Management Plan for the Noosa North Shore Beach Campground
Upgrade Revision 1 March 2017 prepared by Ecological Natural Area Management.
Page 10 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.