RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                             14 AUGUST 2018


    Vegetation Management
    Works within Protected Land
    12.   The following works must be undertaken within the land generally located east of the
          site and to the north of the site to remedy historic camping encroachment on the dune
          system.
          a.     Restoration of the cleared areas of the dune system to a natural state similar to
                 dune vegetation structure found at immediately north of the Third Cutting.
          b.     Restoration works must occur between the latitudes of -26.3307 and -26.3357.
          c.     The establishment of restoration works must commence within 12 months from
                 date this development permit takes effect.
          d.     Restoration establishment works must be successfully completed within 36
                 months from date this development permit takes effect.
          e.     The restoration works must be maintained in good order for the life of the
                 development.
          f.     Public access from the camp ground, through the esplanade, to the beach must
                 be controlled to prevent disturbance to the restoration area.
          Fencing to Protected Land
    13.   A permanent fence must be constructed along the entire length of the eastern interface
          of the site. The fence must be constructed to protect the esplanade from public access
          generally in accordance with the alignment on the approved plan and include:
          a.     Controlled beach access points;
          b.     Signage promoting the restoration works.
                                                                                                 Carried.



3   MCU17/0014 APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL CHANGE
    OF USE OF PREMISES MULTIPLE HOUSING TYPE 4 CONVENTIONAL 10 UNITS AND
    COMMERCIAL BUSINESS TYPE 1 OFFICE AND TYPE 2 MEDICAL FOR 30-32
    DOONELLA STREET TEWANTIN
    Cr Jurisevic declared a perceived conflict of interest in this matter (as defined in section 173 of the
    Local Government Act 2009) due to the applicant being a family friend. Cr Jurisevic left the meeting
    room for the debate and decision on this matter.
    Committee Recommendation
    Moved:             Cr Wellington
    Seconded:          Cr Stockwell
    That Council note the report by the Coordinator Planning, Patrick Murphy to the Planning &
    Environment Committee Meeting dated 8 August 2017 regarding Application No.
    MCU17/0014 for a Development Permit for Material Change of Premises – Multiple Housing
    Type 4 Conventional (10 units) and Commercial Business Type 1 Office and Type 2 Medical
    situated at 30 and 32 Doonella Street Tewantin described as Lot 903 on T1631 and Lot 32
    on RP893427, and:
    A.    Approve the application in accordance with the following conditions:



                                                                                          Page 11 of 25
Log in to download the original file

2017-08-14 General Committee Meeting Notes(PDF, 833KB).pdf · 853 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.