Erosion and Sediment Control
39. Prior to the completion of the development, all site surfaces must be effectively
stabilised. For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil
loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
water contamination.
Water Quality and Quantity
40. Except as otherwise modified herein, the development must be designed,
constructed and maintained to achieve the stormwater quality and quantity
outcomes detailed in the Site Based Stormwater Management Plan for 30-32
Doonella Street, Tewantin Rev C by Bornhorst and Ward dated May 2017.
41. The development must include measures to prevent oils, hydrocarbons or other
pollutants likely to be released in basement areas from being released into
Council’s Stormwater system or other receiving waters.
42. Water quality treatment devices must be shaped and designed to be low
maintenance, and integrate into the landscape. Where bioretention devices are
proposed, the Operational Works Application for Stormwater Drainage,
Landscaping and Earthworks must demonstrate how the design is consistent
with the most current version of the Water by Design Bioretention Technical
Design Guidelines.
43. Water Quality Treatment devices must be operated and maintained in
accordance with manufacturer’s specifications and relevant maintenance
manuals.
44. Prior to commencement of use the Community Management Statement must
include provision for the engagement of personnel to operate and maintain Water
Quality Treatment devices in accordance with manufacturer’s specifications,
relevant maintenance manuals and the Site Based Stormwater Management
Plan for 30-32 Doonella Street, Tewantin Rev C by Bornhorst and Ward dated
May 2017.
Water Reuse
45. Detail design plans submitted with the Operational Works Application must
demonstrate how waters will be reticulated from the rainwater storage tank to
reuse areas with a minimum water use of 342KL per annum.
46. A suitable backflow prevention device must be installed on water reuse facilities
to protect the potable water within the reticulated water supply in accordance with
AS/NZS 3500:2003 Plumbing and Drainage.
WASTE MANAGEMENT
Waste Storage
47. The development must provide waste storage and disposal facilities in
accordance with Planning Scheme Policy 9, Waste Management, including an
external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring
properties.
Page 19 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.