2017-08-14 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 14 AUGUST 2018
The waste management facilities should ensure recyclables bins are
appropriately sited and accessible, and/or provided with their own waste shute,
to ensure recyclable waste is not placed in the general waste shute.
48. The site must be provided with a bin wash area with a cold-water tap, hose and
drain outlet connected to sewer, via a bucket trap. The drain outlet is to be
designed to prevent storm water entry to the sewerage system which can be
achieved by a bunded area, with a nib wall height of 100mm maximum, enclosing
a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively, the waste
area can be roofed, or any other appropriate design approved by Council.
Building Demolition/Removal/Relocation
49. A Waste Management Plan (construction and demolition) must be submitted and
approved by Council’s Environmental Health Officer prior to issue of a
development permit for operational works for demolition, removal or relocation of
any building other than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of
waste for the effective reuse and recycling of such materials. Segregated wastes
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste Management Plans (construction and demolition) are required to be
submitted in accordance with Planning Scheme Policy 11, Waste Management
Plans.
Waste storage areas must provide adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are
convenient and safe to use.
The Plan must contain the following information:
The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application.
A waste management table as indicated below is to be completed showing
how waste material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials contractor and
volume(m³) *specify *specify
landfill site or
proposed re- contractor
other disposal
use or on-site and recycling
site
recycling outlet
methods
Excavation material
Green waste
Bricks
Concrete
Timber-please specify
Page 20 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.