Original source · versioned page text
2017-08-14 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 14 AUGUST 2018
Plasterboard
Metals - please specify
Asbestos
Other - please specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
ENVIRONMENTAL HEALTH
Noise
50. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
Air-conditioning and Refrigeration:
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
Pumps:
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building. All equipment should be
operating at the same time to test the overall noise level created, with the
measurement location at either the residential boundary or outside the most
exposed part of an affected building - whichever is the closest to the
plant/equipment.
The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice.
B. Find the following are sufficient grounds to justify the decision despite conflict with the
Planning Scheme:
1. The multiple dwelling use is existing on the site.
2. The development will provide centrally located small dwelling units with access
to Tewantin’s facilities and services.
3. The development’s small dwelling units will increase residential housing options
in the locality and are likely to be relatively affordable.
4. There is no identified need for further community or infrastructure facilities within
Tewantin and the development will not unduly constrain land available for
commercial or community uses consistent with the site’s zoning provisions.
Carried.
Cr Jurisevic re-joined the meeting.
Page 21 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.