37. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction must be notified to Council in writing within five business
days of the change occurring.
38. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
Landscaping Works
39. The development must be landscaped in accordance with these conditions and the
approved landscape plans prior to the commencement of use.
40. A minimum pot sized 100L street tree must be installed in the Tewantin road frontage
and:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
c. Be of an approved Council species suitable for the location and of local origin.
d. Planted in accordance with Planning Scheme Policy 3 Landscaping Plants and
Guidelines.
41. Landscape works must be supervised, undertaken and certified by a horticulturist. All
works must be completed in accordance with this Decision Notice.
DURING CONSTRUCTION
Engineering
42. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the development.
43. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit.
44. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines.
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Pavement Design and Construction
45. Pavement design for privately owned works must be undertaken in accordance with
the relevant standards. Structural integrity of the driveway and car park areas will
remain the responsibility of the property owner/developer and must be certified by an
RPEQ.
Page 6 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.