2022-11-14 GC Agenda - Item 8 - Attachment 1 - Operational Plan update Q1 22_23
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCorporate Plan Theme - The Noosa Community Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Areas Update Q1 Status
Focus Areas
2.4 Continue to Progress the implementation Strategic direction for the development and Community NDSC pathways and roads Civil project is On track
support our of the Master Plans for the implementation of sport and recreation facilities Facilities awaiting grant funding approval to
community to Noosa District Sports progress project further.
utilise Council Complex and Cooroy Sports ReGen project has feasibility study
controlled land and Complex currently underway with consultant to be
buildings through completed by end of Nov.
formal tenure MacKinnon Drive project progressing,
arrangements tender received and funding options
reviewed, with report likely to council in
Oct.
Cooroy Sports Complex has some
preliminary concept designs done and
currently working through development
approval process.
Noosa Leisure Centre Optimization of the use of the facility and Community Currently out for ITQ, with awarding of On track
Options Study community needs are met Facilities contract likely in November.
Wallace House Wood Borer Preventative maintenance to ensure the Property Branch Discussing scheduling options with On track
inspection structural integrity of the building resident group.
Repaint Peregian Beach Surf Preventative maintenance to ensure the whole Property Branch Painting completed. Completed
Clubhouse of life structural integrity and amenity of the
building
2.5 Plan and build All-Abilities Playground Increased interaction and inclusiveness making Infrastructure Playground opened in May 2022. Completed
an iconic all completed it easier for kids of all abilities to take part in fun Planning Design
abilities playground and challenging outdoor play and Delivery
at Cooroy Branch
2.6 Explore options Pre-Feasibility Study Noosa Options and scenarios for a new regional art Director Community engagement undertaken and On track
for and investigate Regional Gallery (Stage 2 & gallery are analysed to assist Council in Community analysis complete, Gold Coast & Tweed
the feasibility of 3) deciding whether to proceed to a further stage Services Gallery site visits complete, preparation for
relocating the in this project next milestone Councillor workshop (24
Noosa Regional Nov) underway.
Gallery
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.