2022-11-14 GC Agenda - Item 8 - Attachment 1 - Operational Plan update Q1 22_23
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCorporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Areas Update Q1 Status
Focus Areas
4.1 Adopt a new Town Continue to monitor and Land use and development Director Working through proposed amendments with the Behind
Planning Scheme review as required through outcomes are aligned with the Environment & State. Housing inclusionary zoning causing delays. Schedule
amendments to the Noosa strategic intent of Noosa Plan Sustainable Likely to be put to Council before end of 2022.
Plan to ensure its application Development
continues to achieve
strategic objectives for
sustainable development
Continue rollout of Place Measured improvement in Director Place score data analysed. Internal stakeholder Behind
Making project including liveability through planning, design, Environment & workshop held. Schedule
identification of a pilot place and management of public spaces Sustainable
for the place program Development
4.2 Implement an Continue to implement Transport options contribute Director Operational activities ongoing - Free Holiday Buses, On track
integrated Transport priority activities from the positively to a strong economy, the Infrastructure Free Weekend Buses, Flexi Link Cabs, Council
Strategy that Noosa Transport Strategy health and wellbeing of the Services Cabs, Schools Program, Community programs,
encourages alternative community and a low carbon future Transport Planning activities in coordination with
transport usage and Translink.
reduces our Integrated transport and Land Planning for future transport and Strategic Land Use Project needs have been scoped in combination with On track
dependence on Use modelling traffic infrastructure requirements Planning Infrastructure Planning & Design.
private motor vehicles supports future development
Implement the Walking and Facilitation of walking and cycling Infrastructure 413m of pathway delivered this financial year and On track
Cycling Strategy for transport, recreation, health, Planning, Design & 2541m under construction.
and tourism Delivery Infrastructure delivery is on track.
Accepting end of trip facilities which are being
delivered only in coordination with existing capital
projects. This includes priority infrastructure projects
listed in the NCWSIP. Actions listed to encourage
increased participation are underway with a focus on
school age education and training.
Council is partnering with private industry to deliver
e-bike guided rides and other media to encourage
use.
Noosa Hinterland recreation Increased recreational Environmental Trail Masterplan implementation plan underway. On track
trails upgrade/implement opportunities and improved multi Services, Trail asset management plan underway.