Log in to see the plans as drawnCorporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Areas Update Q1 Status
Focus Areas
Noosa Trails Master Plan use trails and linkages within the Infrastructure Trail 5 upgrade under construction and Trail 7 creek
informed by an Audit of the trails network Planning, Design & crossing upgrade program being scoped.
trail network Delivery.
Pathways expansion Improved access and connectivity Infrastructure 413m of pathway delivered this financial year and On track
within the shire Planning, Design & 2541m under construction.
Delivery Infrastructure delivery is on track. Accepting end of
trip facilities which are being delivered only in
coordination with existing capital projects. This
includes priority infrastructure projects listed in the
NCWSIP. Actions listed to encourage increased
participation are underway with a focus on school
age education and training.
Council is partnering with private industry to deliver
e-bike guided rides and other media to encourage
use.
Support free weekend buses Incentivised public transport and Infrastructure Free weekend bus trial in progress. On track
reduced traffic congestion Planning, Design & Consultation and review in progress.
Delivery
Noosa Woods Ferry Jetty Investigation of the Noosa River as Infrastructure Not yet commenced. Not
investigation a means of public transportation Planning, Design & started
and increased access to the Noosa Delivery
Woods
Car Park Management Improved travel information and Infrastructure Consultant procurement in progress. On track
Technology Trial parking management through Planning, Design &
innovative, intelligent parking and Delivery
access control systems
Undertake feasibility Increased accessibility and Infrastructure In consultation phase with DTMR for overarching On track
assessments for transit contribute to a more sustainable Planning, Design & transport strategy in the region.
HUBS Noosa Civic and transport system Delivery
Cooroy
Noosa Heads Multi Modal Increased use of public transport Infrastructure Concept layouts and traffic modelling in progress. On track
facility design and other sustainable modes of Planning, Design &