Skip to the record
Search everything, all in one place.

Council archive · source document

Minor Change Existing Approval 51986 3023 05 · 51986.3023.05

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                           WD 1.5        A      Pool Floor Plan – proposed, prepared by Sparks           07.10.20
                                                Architects and as annotated by Council
                           WD 2.1        B      North Elevation, prepared by Sparks Architects           28.10.20
                           WD 2.2        A      East Elevation, prepared by Sparks Architects            07.10.20
                           WD 2.3        A      West Elevation, prepared by Sparks Architects            07.10.20
                           WD 3.3        A      Section C, prepared by Sparks Architects                 07.10.20
                           WD 3.5        A      Section E, prepared by Sparks Architects                 07.10.20
                           WD 3.6        A      Section F, prepared by Sparks Architects                 07.10.20
                           WD 3.7        A      Section G, prepared by Sparks Architects                 07.10.20
                           WD 8.4        A      Pool internal Elevation, prepared by Sparks Architects   07.10.20

                      Performance Bond
               38.    Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
                      start meeting. The cash bond or trading bank guarantee will be returned on performance of
                      the conditions of approval less any costs incurred by Council in respect of enforcing
                      performance of this permit. Council reserves the right to call upon the bond or guaranteed
                      sum to effect compliance with conditions.
                      Works
               39.    All works must be undertaken outside of all school holidays.
               40.    The 2 pathways connections extending from the site at the eastern and western beach
                      access points to the Council boardwalk must:
                      a.      be constructed in accordance with the approved plan;
                      b.      be constructed with a suitable slip resistant surface;
                      c.      be constructed at the same level as the adjacent boardwalk and match smoothly with
                              the boardwalk; and
                      d.      the adjacent landscaped areas must be filled to the level of the pathway to eliminate
                              any trip/fall hazard.
               41.    A Construction Management Plan must be submitted to and approved by Council prior to the
                      issue of a Building Permit. The Construction Management Plan must address the following:
                      a.      site access points for workers, deliveries and heavy machinery;
                      b.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction;
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased;
                              iii.     proposed fencing to the site during the construction phase of the development;
                                       and
                              iv.      provision for worker car parking and delivery/waste areas.
                      c.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures;
                      d.      works programme identifying key components of the works and their respective
                              durations



                                                                                                           Page 3 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024

Used in these records

About this file

File size
585 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51986 3023 05.pdf · 585 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.