                      e.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      f.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager;
                              ii.      dispute resolution procedures; and
                              iii.     signage locations displaying the abovementioned details
                      g.      details on the location of external fill/dump sites/sources, the haulage route, type of
                              vehicle to be utilised during operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations must be fully repaired at the
                              applicant’s expense.
               42.    Prior to any works (including demolition works) commencing a pre-start meeting is required.
               43.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Demolition and building;
                      b.      Civil engineering works;
                      c.      Landscape works;
                      d.      Erosion and sediment control works;
                      e.      Other relevant parties.
                      Approved Plans – 19 August 2021 & 25 January 2023
               44.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.      Rev.    Plan/Document Name                                       Date
                           A111          L       Proposed Apartment Floor Plan, (Unit 8) prepared by
                                                 Natani Design
                           A112          L       Proposed Roof Top Terrace, (Unit 11) prepared by         16.07.2021
                                                 Natani Design
                           A202          L       East Elevation, (Unit 11) prepared by Natani Design      16.07.2021
                           A203          L       North Elevation, (Unit 11) prepared by Natani Design     16.07.2021
                           A211          L       3D East View – Proposed, (Unit 11) prepared by Natani    16.07.2021
                                                 Design
                           A212          L       3D North Views, (Unit 11) prepared by Natani Design      16.07.2021
                           DD 0.1        A       Cover page prepared by Sparks Architects                 26.08.2022
                           DD1.2         A       Ground Floor Plan prepared by Sparks Architects          26.08.2022
                           240922/01     A       Landscape Plan Ground Floor prepared by John Hope        Sept 2022
                                                 Designs as amended by Council with the 2 Pandanus
                                                 pedunculatus replaced with Syzygium austral ‘Pinnacle’
                           DD1.3         A       Level 1 Floor Plan prepared by Sparks Architects         26.08.2022
                           240922/02     A       Landscape Plan Level 1 prepared by John Hope             Sept 2022
                                                 Designs
                           DD1.4         A       Level 2 Floor Plan prepared by Sparks Architects         26.08.2022




                                                                                                            Page 4 of 13
Document Set ID: 23033864
Version: 3, Version Date: 28/05/2024

Used in these records

About this file

File size
585 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51986 3023 05.pdf · 585 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.