Attachment 3 - Revised Slope Stability Assessment
Brett Hage 22328-001-Rev1
17 November 2022
Table 2: Setbacks for surface irrigated land application area for on-site sewage treatment plant
Site Feature Horizontal separation distance
Property boundaries, pedestrian paths and walkways 2m
Water edge of a swimming pool 6m
Dwellings, recreation areas 10 m
Note: Distances measured from the edge of the irrigated wetted area to any point of the feature.
Table 3: Setback distances for on-site sewerage facilities (Protection of surface and groundwater)
Separation Distance
Site Feature
Advanced Secondary Secondary Effluent
Effluent
Surface Waters:
Top of bank of permanent or intermittent water course, lake,
bay or estuary;
Top water level of a surface water source used for agriculture, 10 m 30 m
aquaculture or stock purposes;
Open stormwater drainage channel or drain;
Bore or a dam.
Unsaturated soil depth to a permanent water table (vertically) 0.3 m 0.6 m
Note: Distances measured from the edge of the irrigated wetted area to any point of the feature.
Unsaturated soil depths of 0.6 m (i.e. depth to rock or wet soil) and 0.3 m are recommended for Secondary
and Advanced Secondary effluent, respectively. Boreholes indicate adequate unsaturated soil depths are
available.
Individual site layout shall be decided at building stage, in conjunction with a design provided by a NC
registered evaluator.
5.3.3 System Construction
Construction of wastewater land application areas must be carried out in accordance with Appendix M of
AS1547:2012 and NC requirements. In order to prevent any adverse impacts on the water quality from
effluent disposal, the elements given below shall be implemented:
Shallow subsurface drip systems must be installed at 100 mm to 150 mm depth into 150 mm to
250 mm of good quality sandy topsoil, in grassed of other suitably vegetated areas. Any sandy
topsoil material won from site works may be used to supplement the soil within the respective
disposal fields or alternatively shall be imported to the site.
Receiving native soils will be prepared by undertaking deep ripping / shallow cultivation combined
with the addition of organic matter (10 kg/m² raw mulch) and gypsum (1 kg/m²) to ‘break up’ any
relatively hard clay subsoils and improve overall drainage characteristics.
Shallow subsurface irrigation lines will run parallel to slope contours. To evenly distribute
wastewater throughout the irrigation areas, pressure equalisation systems (i.e. pressure
compensating drip emitters) should be installed.
17/19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.