Attachment 3 - Revised Slope Stability Assessment
Brett Hage 22328-001-Rev1
17 November 2022
Surface diversion drainage shall be installed on the up-slope sides of the land application areas to
divert surface water and shallow subsurface seepage flows away. Such drainage should penetrate
to a minimum depth of 0.3 m BGL.
A low earthen bund shall be constructed, down slope of the effluent disposal areas up to 0.3 m high
to retain run-off and promote sheet flow.
Plant and maintain grasses, reeds and/or small shrubs within the land application areas. Preference
should be given to native plant species endemic to the local area, which are suitable for mostly wet
soils and are tolerant of nutrient loads (e.g. native riparian vegetation)
Erect signage at the boundaries of the area in at least two places in accordance with Council
requirements to warn people regarding the presence of wastewater pipes (e.g. “Sewage Effluent
Pipework Installed Below – DO NOT DIG” or “Recycled Water – Avoid Contact - DO NOT DRINK”).
Erect barriers where necessary to restrict access to public which may interfere or damage the
irrigation system.
Detailed design of the effluent disposal systems must be carried out by a NC registered evaluator to
accompany the plumbing application at the building stage, once the building designs are finalised.
5.3.4 Maintenance and Inspection
Operation and maintenance of a HSTP is the responsibility of the property owner. A licensed service agent
must be appointed to undertake routine servicing works in line with regulatory authority approval conditions.
To comply with NC requirements, the following management and inspection shall be implemented once the
effluent disposal systems are established:
Continuous monitoring by the property owner for any signs of system failure such as septic odour,
seepage, soil and/or plant discoloration.
Should any signs of system failure be observed by the property owner, including the in-built HSTP
failure alarm, the manufacturer shall be contacted immediately to arrange for the necessary repairs.
Quarterly inspection, testing and repair (if necessary) to the HSTP and irrigation area by a Licensed
Inspector (normally a service provided by the HSTP manufacturer).
6.0 SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
impacting the proposed development. This advice is subject to implementation of the recommendations
given in this report.
This assessment relates only to the proposed subdivision for the development application
process. Existing structures, batter slopes and road connections may be subject to risk of slope
instability but assessment of those matters was beyond the scope of our commission. Also excluded
from this assessment are any future building works, which would be subject to site specific assessment
and review by a geotechnical RPEQ prior to construction.
18/19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.