item 10: Provide confirmation of the proposals consistency with the management plans for the site.
Applicant’s Response: , ove
This development application , seeks approval for 22 Units over the site in a slightly different
configuration to units approved under 23119 DA. 23119 DA was approved for 22 units over the site in
a four storey building with basement carparking. This application was approved subject to a range of
conditions and the applicant is willing to accept similar conditions i in this regard.
taf OT ey t
It is also noted that the conditions of the Reconfiguration of a Lot approval (23118 DA) listed a number
of management. plans that. were to relate to the design, construction and operational phases of the
development. Most. of these plans relate to the overall development of the site with conditions
detailing that the operational works applications are to: ‘comply with the relevant Management Plans.
Applicant's jg leceate ye
The applicant's. traffic engineer has reviewed the plans and indicates that the proposed: ramp is 7.0
metres wide. _Refer, to Dianne Hayes Traffic Engineering Report Dated June 2008.
item 12: Amend plans to indicate turning areas at the end of carparking aisles.
Applicant's Response: -
The applicant's: traffic efigineer Dianne : Hayes ‘has. reviewed the [proposal and advises. that the
carparking layout i is ‘acceptable. Refer to Dianne’ Hayes Traffic: Engineering Report: Dated: June 2008.
ote ath . "Dk . * at nt mo ‘ -
tem 13: __ Indicate on the plans the tuming paths for vehicles at the intersection at the base of. the
me at the entry. .
Applicant's
The applicants. traffic engineer Dianne Hayes has reviewed the proposal and advises that the ramp ~ My
entry and aisle width comply with Australian Standards. Refer to Dianne Hayes Traffic Engineering
Report Dated June 2008.
ftem, 14: Indicate sight lines at the aisle and ramp intersection. ' vs LO : vs
Applicant's Response: .
The applicant's. traffic ,engineer Dianne’ ‘Hayes has reviewed. the proposal’ and advises that ‘sight
distances are adequate for the proposed: development. Refer to Dianne Hayes Traffic Engineering : a
Report Dated: June 2008. . . oy
,
at!
item 15: - Indicate Sight lines for reversing from the disabled carspace. 7
Applicant's Response:
The .applicant's traffic.engineer Dianne Hayes has reviewed the proposal and advises that sight
distances are adequate.: Refer to Dianne Hayes Trafic Engineering Report Dated June 2008. ©
item 1 ee ee rovick dimensions forcarparking sisies, ramp and carspaces.
Applican 's Response: ’ : fa a ;
Amended, plans have. been prepared and are: ‘included in'the DBI booktet. These ametided. plans ~ " ww He
detail dimensions for the’ aisles, ramp and carspaces. . Refer to Dianne Hayes Traffic: Engineering ° ve
Report Dated June 2008."4. - wy ,
. *Indicate. on :the plans the grade of access ramp and provide detail on the available,
7, ™+sheadroom, . a. :
Applicant's Response: on: ‘ : co
Amended plans’ have been: Prepared and are inéluded in the DBI booklet. These amended plans ‘
detail dimensioris. for the. aisles, ramp and carspaces. Refer to Dianne Hayes Traffic Engineering
Report Dated June 2008.” .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to information request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.