Council archive · source document
08/0175 - Response to information request [As Published] · 132008.175
wee . The applicant. will comply with relevant Council policies in this regard. . we - ey “+ a. @ Pages ‘ z. . - ” . er a . ftam 18: Indicate the location of service and delivery \ vehicles parking. Applicant's Responge:’ Amended plans have beén prepared and are included i in the DBI booklet. Refer to Dianne Hayes Traffic Engineering Report Dated June 2008. : ttem 19: Access criveway traverses existing water and sewer mains. Provide details on proposed vertical clearances. Applicant's Response: St ay The applicant Has provided additional plans that details the vertical clearances of existing services in " relation to the access driveway Refer additional pages DBI - 74 to 77._ item 20: ” Provide preliminary ‘stormwater disposal desin Applicant’s Response: “| “* In accordance with the conditions of the Reconfiguration of a Lot approval (23118 DA) a stormwater management plan’specific to the proposal will be lodged as part of a future application for Operational Works - Earthworks and Drainage. The reconfiguration conditions indicate that any Operational Works applications will be. required to comply with the Stormwater and Water Quality Management Plan. cy 4 Council has previously taken the approach for eulrolinaling: \ots (3:to 6) of conditioning the approvals to require submission, of Operational works applications with regard: to stormwater. The. Applicant: is willing to accept a condition in this regard. item 21: Provide drawings that clearly indicate locations of all infrastructure on site. I *s Response: . 7 Plans prepared by Ken Hicks and Associates numbered 050908 details the location of the existing : sewer lines around the boundaries of the site. item 22: . Provide along section of prepased finished surface level along line of existing sewer Applicant’s Response:., Amended:plans have been’ prepared and are included i in the additional pages 74077. ‘Itis noted that the buildings are well clear of the sewer line. wot Item 23: — - Provide cross sections of finished levels across easement and walkway. , Applicant’s Response: Amended plans have been prepared and are included in the additional pages 74 to 77: : . oe “ys ‘ ‘ va ey Ry, item'24: ° ‘Landscaping to comply with Noosa guidelines. Applicant’s Response: ® t aot ve ated oa . “, . . ote , * ftem 25; °* . . Waste Management Plan. mo %, Applicant's Response: ‘ The applicant.has’ indicated that the buildings will’ be served by garbage and recyclable waste chutés.” * on each level. ‘These’ will discharge into waste bins within the basement area which will be emptied = -r«., periodically at the: street by either Council waste management services or an approved contractor: Sufficient room has been.afforded within the basement area for bin storage such that the bins may be (B rotated, replaces and/or,stored between and during street servicing. The process of bin rotation and eR the arrangement for collection will be the responsibilty. of a dedicated manager in accordance with the / Mos Community: Management Statement wae
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to information request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.