Original source · versioned page text
Appendix D - Engineering Report & Plans
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ENGINEERING REPORT
Proposed 1 into 2 Lot Rural Residential
Subdivision
At
108 Black Mountain Range Road,
Black Mountain
For
Total Concept Homes
A6578/20/ENG
December 2020
SR/tk
Prepared by Brah101 Pty Ltd T/A ALTA PROJECTS ABN 91 611 354 511
Civil and Structural Engineering & Design
Project Management
26 Memorial Ave
P. O. Box 559
Cotton Tree, QLD 4558
Telephone: (07) 5475 4125
Facsimile: (07) 5479 1607
e-mail: [email protected]
The content of this document is provided in strict commercial confidence. The content of this document
shall not be disclosed to any third party, without the express written authority of Alta Projects.
Document Control
Revision A6578/20/ENG - Authorised for Issue
Author Signature
No. Date Reviewer Signature Document Status
December Will Millroy Stephen Roberts
2020 RPEQ 07665
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 14 (of 16)
Section 2
- CONTENTS - 1.0 INTRODUCTION .............................................................................. 1 2.0 SITE DESCRIPTION .......................................................................... 1 3.0 BULK EARTHWORKS....................................................................... 2 4.0 ACCESS .............................................................................................. 2 4.1 Sight Stopping Distance ............................................................................... 3 5.0 STORMWATER MANAGEMENT .................................................... 3 5.1 Stormwater Connection and legal point of discharge ............................. 3 6.0 SEWERAGE ........................................................................................ 3 7.0 WATER ............................................................................................... 4 8.0 CONCLUSION ................................................................................... 4 APPENDIX A – Proposed Plan of Development APPENDIX B – Preliminary Infrastructure Plans
Section 3
1.0 INTRODUCTION
This engineering report is lodged in support of a Reconfiguration of Lot
application seeking to develop a 1 into 2 lot rural residential subdivision and new
driveway at 108 Black Mountain Range Road, Black Mountain, also described as
Lot 2 RP131369
This report addresses relevant engineering issues and should be read in
conjunction with attached layout plan and engineering drawings.
Importantly, this report seeks to address civil engineering issues at a level
appropriate for a Development Application.
Figure 1.0 depicts lot configuration of the proposed development.
Figure 1.0 – Development Layout
2.0 SITE DESCRIPTION
The subject site is located on 108 Black Mountain Range Road, Black Mountain
(Lot 2 RP131369). At present the site consist of a single dwelling with remainder
of the site covered in grass and vegetation. The site is approximately 5.977Ha
with the front half of the property sloping at approximately 22% from South to
North. The back portion of the property consists of a gully that runs through the
centre, towards the South-East corner. The land slopes at approximately 20%
towards the gully. The existing house at the front of the property will remain.
________________________________________________________________________
A6578/20-Engineering Report/108 Black Mountain Range Road, Black Mountain 1
October 2020 SR/tk
ALTA PROJECTS
Section 4
Minor earthworks including the construction of a two-tier retaining wall has
previously been completed along part of the front western boundary.
Figure 2.0 depicts locality of the proposed development.
Figure 2.0 – Locality Plan
3.0 BULK EARTHWORKS
The development requires minor earthworks and retaining walls to construct the
access driveway. A slope stability report has been undertaken by tectonic Pty Ltd
which identifies the works can proceed with the appropriate factors of safety.
Refer Tectonic Report 202332-001-Rev0.
4.0 ACCESS
Access to the subdivision will be taken from Black Mountain Range Road. A new
residential driveway is proposed to access the new allotment. The existing access
crossover will be sealed and constructed in accordance with council standard
drawings.
________________________________________________________________________
A6578/20-Engineering Report/108 Black Mountain Range Road, Black Mountain 2
October 2020 SR/tk
ALTA PROJECTS
Section 5
Refer to Appendix B for preliminary infrastructure plans which identify
proposed road cross sections and layouts.
4.1 Sight Stopping Distance
A sight stopping distance study was completed for the development. The
findings show that the southern uphill approach to the proposed driveway
access is adequate for design speed of 90km/h (sign posted 80km/h plus
10km/h). The actual stopping site distance for the northern approach which is
downhill satisfies a design speed of 80km/h with 1.5seconds reaction time. It is
considered a reaction time of 1.5 seconds to be suitable for this location as there is
an existing intersection to the south of the proposed development. The existing
horizontal curve of Black Mountain Range Road at the location of the proposed
access is approximately 167m which caters for a design speed of 80km/h. We
note the posted speed is 80km/h, however with the constraints of the existing
horizontal curve, the available sight distance is adequate. It should be noted the
access location is an existing driveway.
5.0 STORMWATER MANAGEMENT
5.1 Stormwater Connection and legal point of discharge
The existing dwelling utilises rainwater tanks for water supply. Surcharge
from rainwater tanks sheet flows towards existing stabilised steep
vegetated gullies.
The proposed building envelope for lot 2 is clear of lot 1 existing discharge
locations and will not suffer from nuisance flows.
Similarly proposed lot 2 will require rainwater tanks for water supply and
irrigation/reuse. Should the tanks become full or overflow a level
spreader will see discharge returned to sheet flow toward existing gullies.
There are no properties downstream that can be impacted by nuisance
flows.
6.0 SEWERAGE
The existing property is serviced via an onsite effluent disposal system. It is
proposed that the new allotment be serviced via similar system. Detail design of
the system will be undertaken by a suitably qualified consultant at BA.
________________________________________________________________________
A6578/20-Engineering Report/108 Black Mountain Range Road, Black Mountain 3
October 2020 SR/tk
ALTA PROJECTS
Section 6
7.0 WATER
Water supply to the existing allotment and proposed lot 2 will be via rainwater
tanks sized to BCA requirements.
8.0 CONCLUSION
The proposed 2 lot subdivision over existing Lot 2 RP131369 can be serviced by
the use of roof water tanks and on site sewer effluent disposal systems. Access to
the site will be via Black Mountain Road Range and the existing driveway.
There are no constraints or impediments to the proposed residential development
that cannot be overcome with good operational work engineering design.
________________________________________________________________________
A6578/20-Engineering Report/108 Black Mountain Range Road, Black Mountain 4
October 2020 SR/tk
ALTA PROJECTS
Section 7
A
Appendix
Proposed Plan of
Development
[OCR of page images]
A
Proposed Plan of
Development
Section 8
2RP223018
Blac
274.1
k Mou
2
13. 4
11 3
5
70.
39.
ntai
.6
1.597ha
8
Building Envelope . 3)
1 3 .8
(84
2736m² 315.1
nR
9
42.
7
6 4 .7
( 19
ang
.9 )
5 0 .1 29
1
.4
5 2RP131369
15
eR
11.1 5
22.3 1 1 .3 5.
6
Emt A in Lot 1 4.38ha
8. 5
2 1 .1
oad
60.7 1151m²
106.9
(530)
3RP131369
36RP897845
Notes.
1.Boundaries are compiled from the DCDB and have not been surveyed in the preparation
of this plan. Areas and dimensions may therefore vary on survey.
2. Emt A is for access and services.
Client: Horizontal Datum: Drawing Number: Surveyed/Checked: 103 Wrigley St (Cnr Sugar Rd)
TOTAL CONCEPT HOMES MGA 56 vide DCDB
208516-03-01 PO Box 5774
Vertical Datum: N/A Sheet no.1 of 1 sheets. Drawn/Checked: JPG/ENW MAROOCHYDORE BC QLD 4558
Drawing Title:
PROPOSAL PLAN Co-Consultants: Rev Date Description Date: 16/12/2020 (P) 07 5479 5311
(E) [email protected]
Site Description: Alta Projects Scale: 1:1500 at A3 (W) www.cadcon.com.au
Reconfiguration of Lot 2 on RP131369 into 2 Lots
North Coast Environmental Services
at 108 Black Mountain Range Rd, BLACK MOUNTAIN 0 50 70 ACN 098 201 828 Part of CadCon International Pty Ltd
Tectonic Geotechnical and Environmental Engineers
Section 9
B
Appendix
Preliminary
I nfrastructure Plan
[OCR of page images]
Preliminary
Infrastructure Plan
Section 10
PROPOSED SUBDIVISION ESTATE
at 108 BLACK MOUNTAIN RANGE ROAD,
BLACK MOUNTAIN EXISTING WINERY
for TOTAL CONCEPT HOMES
58
RP900861
55
57 56 RP900862
RP900861 RP900862
60
62 RP900861
RP900860
CU
DG
ER
IE D
RIV
E
8
RP849521
RP900862
9
SP165483 49
5 RP900862
RP224449
48 Job : A6578/20 DRAWING SCHEDULE July 2020
RP900861
DRAWING No. DESCRIPTION
4 37
RP184308 RP900860
38 47
RP900860 RP900861
46
A6578/20/P01 LOCALITY PLAN
RP900861
39 45
A6578/20/P02 ROADWORK LAYOUT PLAN
RP900861 RP900861
44
RP900863 43
A6578/20/P03 ROADWORK LONGITUDINAL SECTION
RP900863
A6578/20/P04 ROADWORK CROSS SECTIONS
1
RP223018 A6578/20/P05 ROADWORKS CONCRETE DETAILS
A6578/20/P06 ROADWORK SITE DISTANCE PLAN
\\
\\\
1
RP845247 40
RP900863
2
RP223018 6
TOTAL PLANS in SET = ____
\ \\
\\
>
2
\\\\\E/OH
>
BUILDING
| | ENVELOPE
234
SP110906
| |
| |
| |
| |
\
\\
\ \\\\
\\
\
1 2
\
RP131369
| |
\
PROPOSED
\
| |
\
\
\
\
SITE 233 236
237
SP110906
\\\\\
235 SP110906
SP110906 SP110906
2
4 RP908513
SP140166
RP DESCRIPTION
3
RP131369
LOT 2 RP131369
D
OA
232
SP110906
R
N GE TAL
LOW 36
3
RP905432
RA OOD
RP897845
A IN PLA
CE
35
RP897846
NT
MOU
A CK 116
RP840238
20
RP897845 21
RP897845 23
24
RP897845
25
RP897846
34
BL
22 RP897845 RP897846
RP897845
26
RP897846
19
RP897845
27
RP897846
0 50 100 150 200 250 Meters
LOCALITY PLAN
SCALE 1:2500 (A1), 1:5000 (A3)
SCALE 1:2500 (A1), 1:5000 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 LOCALITY PLAN
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6578/20/P01 1 of 6
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P01 LAYOUT PLAN.dwg - DATE : 16/12/20 - 11:54am - XREF's: X-Base; X-Survey; X-DCDB Council Ref: ............
Section 11
\\
\ \\
LEGEND:
FINISHED SURFACE CONTOURS
\\\
\\ EXISTING SURFACE CONTOURS
PROPOSED CONCRETE DRIVEWAY
E/OH
\\\
\\
\\
\\\
PROPOSED GRAVEL TRANSITION
>
\\\
\\
>
\\
\\\
\ \\
E/OH
\\
>
\
\ \\\
>
\\\\
\
>
\
\ \ \\
\\\\
E/OH
\
2
>
\\\\\
>
ROCK GABION RETAINING WALL
\\\\\
>
\\\\\
2.5m HIGH MAX BUILDING
E/OH
152
//
150
>
ENVELOPE
3.5m
140
//
\\\\\
| |
| | |
\\\\\
// |
130
| | |
>
|
| ||
|
|
| | | | | | | |
// |
120
| | | ||
|
//
| |
| | | | |
|
110
>
\\\\\
//
| ||
| | |
\\\\\
| | | |
100
E/OH
| | | | | |
| |
| | |
|
| | | |
//
| | | |
| | | | | | | |
| |
|
>
|
| |
|
| |
| | |
| | | | | | |
|
| |
\ \\\\
| | | | | | | |
| | | | ||
|
| | | | | |
0
| |
|
\\\\\
| |
90
| |
| |
|
10
|
| | | | |
>
| | |
| |
|
| |
|
| | | |
| | | |
| | | | | | | | | |
| | | |
| | || | | | | | | | | | | |
| | | |
20
80 1
|
| |
| ||
\ \\\\
|
| | | |
70
| | | | | |
30
|
E/OH
DRIVEWAY ACCESS
60
| |
40
|
| | |
50
| |
6m
|
| | |
| | | | | | | | CONTROL LINE
| | |
|
|
|
\ \\\\
| | | | | |
| |
EXISTING
| | | |
| |
| | |
|
|| | |
|| |
| | | | | | | | | | | | | | | | | |
DWELLING
>
| | | | | | | |
\ \\\\
| | | E/OH
| | |
\ \\\\
|
| | | | | | |
E/OH //
//
>
\\\\\
H
E/O
\\\\\
GRAVEL TRANSITION FROM PROPOSED CONCRETE
>
ROCK GABION RETAINING
\\\\\
WALL 1.2m HIGH MAX DRIVEWAY TO EXISTING GRAVEL ACCESS
\\\\\
D
H
E/O
>
OA
EXISTING POWER
\\\\\
POLE TO REMAIN
R
GE
\
\\\\
AN
\\\\
\
NR
H
E/O
TAI
\\\
\\\\
\\
\
UN
MO
\ \\
\\
CK
\\\
BLA
\\
\\
\\\
PLAN
SCALE 1:500 (A1), 1:1000 (A3)
0 10 20 30 40 50 Meters
SCALE 1:500 (A1), 1:1000 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORK LAYOUT PLAN
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . . Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
Tel (07) 5475 4125 Fax (07) 5479 1607 DRAWING No:
A6578/20/P02 2 of 6
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P02 ROADWORK LAYOUT PLAN.dwg - DATE : 16/12/20 - 11:51am - XREF's: X-Base; X-Survey; X-DCDB; X-Image Council Ref: ............
[OCR of page images]
FINISHED SURFACE CONTOURS
EXISTING SURFACE CONTOURS
PROPOSED CONCRETE DRIVEWAY
PROPOSED GRAVEL TRANSITION
ENVELOPE
ENVELOPE
DRIVEWAY ACCESS,
CONTROL LINE
ROCK GABION RETAINING
WALL 1.2m HIGH MAX
EXISTING POWER
POLE TO REMAIN
PLAN
SCALE 1:500 (A1), 1:1000 (A3)
10 30 40
SCALE 1:500 (At), 1:1000 (A3)
ALTA PROJECTS PROJECT:
ABN ETISS5500 | see | PROPOSED SUBDIVISION ESTATE
Tel (or 8474128 Fax ar 9472 1007 at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
ENGINEERING : DESIGN : MANAGEMENT Mail: [email protected]
Web: http://(www.alta.net.au for TOTAL CONCEPT HOMES
DESCRIPTION ‘At SHEET SIZE FILENAME : A8539-P02 ROADWORK LAYOUT PLAN dng -DATE: 16/1220. tt'Stam - XREFSs: Base; X-Survey, XDCDB; Xmage
Section 12
I.P. CH 15.13 RL193.929
I.P. CH 0.00 RL194.000
EXISTING SURFACE
DESIGN SURFACE
CH 33.208 RL 192.653
CH 43.208 RL 192.246
-1.49%
IP CH 87.98 RL191.760
CH 82.977 RL 191.814
-7.
06
%
CH 92.977 RL 190.941
-1.09%
CH 99.397 RL 189.890
IP CH 38.21 RL192.300
CH 109.397 RL 188.961
CH 127.151 RL 188.567
IP CH 132.15 RL188.456
CH 137.151 RL 187.986
CH 138.707 RL 187.839
I.P. CH 151.82 RL187.171
CH 148.707 RL 187.247
-2.22%
IP CH 104.40 RL189.072
IP CH 143.71 RL187.369
VERTICAL GRADES 3.82% -1.49% -7.06% -1.09% -16.37% -2.22% -9.40% -2.45%
Datum 184.000
VERTICAL CURVE VCR 167.4 VCR 65.4 VCR 70.7 VCR 139.2 VCR 143.8
K: 1.7 K: 0.7 K: 0.7 K: 1.4 K: 1.4
GEOMETRY VCL 10.000 VCL 10.000 VCL 10.000 VCL 10.000 VCL 10.000
DEPTH OF
-0.017
-0.024
0.000
0.015
0.071
0.040
0.049
0.158
0.190
0.213
0.240
0.114
0.118
0.142
0.102
0.106
0.124
0.148
0.097
0.127
0.136
0.140
0.295
0.561
0.935
0.598
0.355
0.090
0.002
0.009
0.015
0.026
0.073
0.048
0.100
0.040
0.000
1.485
1.806
1.805
1.333
CUT/FILL
194.00
194.04
193.94
191.94
189.54
193.99
191.93
191.88
191.36
188.65
187.17
194.08
194.01
193.93
193.59
193.23
192.88
192.54
192.31
192.23
192.17
192.12
192.06
192.01
191.96
191.90
191.85
191.76
191.36
190.61
189.79
189.20
188.95
188.84
188.73
188.61
188.47
188.17
187.72
187.39
187.22
EXISTING LEVELS
194.065
193.965
193.741
193.372
192.992
192.765
192.418
192.169
192.124
192.066
191.994
191.916
191.912
191.828
191.606
190.912
190.276
189.556
189.277
189.196
189.105
188.964
188.835
188.717
188.589
188.401
188.123
187.624
187.346
187.239
191.801
187.171
194.000
193.967
193.942
193.782
191.794
191.314
189.557
189.186
188.636
EXISTING LEVELS
100.000
105.000
110.000
115.000
120.000
123.371
125.000
130.000
135.000
140.000
145.000
150.000
101.775
151.824
CHAINAGE
71.683
71.973
77.316
89.979
10.940
14.336
20.000
25.000
40.000
45.000
30.000
35.000
50.000
55.000
60.000
65.000
70.000
75.000
80.000
85.000
90.000
95.000
10.000
15.000
0.000
7.804
5.000
101.775
094° 50' 44"
R:6.00
124° 47' 17" R:57.50 067° 38'
R:15.95
38" 048° 27' 08" R:30.00 070° 58' 55" 070° 58' 55"
71.683
71.973
77.316
89.979
10.940
14.336
HORIZONTAL
7.804
7.804m 3.14m
3.396m 57.35m 0.290m
5.34m 12.662m 11.80m 21.596m 28.453m
SCALE: Hor 1:100 DRIVEWAY ACCESS
VERT 1:10
LONGITUDINAL SECTION
HORIZONTAL SCALE
0 10 20 30 40 50m
1:500 A1, 1:1000 A3
VERTICAL SCALE
0 1.0 2.0 3.0 4.0 5.0m
1:50 A1, 1:100 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORK LONGITUDINAL SECTION
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6578/20/P03 3 of 5
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P03 ROADWORK LONG SECTION.dwg - DATE : 19/11/20 - 11:52am - XREF's: X-Base; X-Survey Council Ref: ............
[OCR of page images]
3 g
z z
8 2 EXISTING SURFACE
s 3
° 3 DESIGN SURFACE
a a
- s
3 2
49% 2 a
i e 3 zs
2 = 8
Oe 8 = 2 2
“NO 8 ee _
2 r 8 8
= 5 £3
& g 2 ®
a 25
—— 1.09% Bee
8 PJ — 5 8
S as 8
5 BS
z oO z# -
3 g 8 =
2 3 a 8 8
& = z 8 8
a oO 5 ~ 5 2g
\ 3 ze 3g =
8 6 2 3 5
. 3 a 8 % Sz
ze mR Ba
e Jo oC a ER “:
g Bs z®
2 ) Wes BS
Zz ga
= 3
x ae
5 2
2 8
z
=
=
&
a
VERTICAL GRADES 3.824% |-1.49% -7.06% | =1.09 LE -16.37% | | =2.22% [39.40% _|-2.45%
aaa Lo VoR 174 dowels Verto Lt voR 392 ton ss
VERTICAL CURVE KAT K:0.7 KOT K: 14 K: 14
GEOMETRY VCL 10.000 VCL 10.000 VCL 10.000 VCL 10.000] VL 10.000
DEPTH OF & x
s| glgigisiseis| =| =| s} sg) sf a} gf} 5] alsisigsalsisisisis| aigisl S| a) algisigl sl sf gs} &
CUT/FILL S| SSssisjsjs§) 5] S| 5) 5) S| 5 S| 8) SSS S82 /S2|2 8) 22/8] 3] S| 5/85) 3] 3 5) S| 5
el alelsialslelalel 2 sal cl a sl slalsislals sl elalel adelsisi cl al al a
EXISTINGLEVELS 5) S/sis/alzlesis| s| s| sl si al sl sl s| lee(oelslseisi| zieisl s| 2] sigiaa) a S| 2 sig
sl sisigisialsiaia) sl 2] al al al el] es} alslaisisiaieisisisl aleis gi cesigisl a} s als
EXISTINGLEVELS & S3S3/R 8/53) & S| BS 8 8 SF SF Sages sags Sees 2 Fess Ss Fy 85
-—— 3] S/8/S/S/B) Saja) s) 3) a B| B B SB a Oo Z| B] BS] B/B/S) 2) B/S) a) &) S| a Sis) eS 2 S| s| ag
CHAINAGE 3} elaigig/sjeigg) s| gs} el el el gs} ge) gs} slaisisstelssjalg| Se) €) S SSS SE S es
SF _siris}=|=eiaia} sls] s| S| es] | sl e SiFeelh si sieis)s) S/S)S) =) =| S88) & SS) SF SS
Joa? 50'RYB#D4T|" R57.50 06%BFeofos 048° 27'08" |= RG000 | 070° 5855" 070° 58° 55"
HORIZONTAL 7.604mgiche06f-3 ————___sraem re 12,662m |g 11.80m 5 21.596m 28.453m
SCALE: Hor 1:100 DRIVEWAY ACCESS
VERT 1:10
LONGITUDINAL SECTION
HORIZONTAL SCALE
Q 10 20 30 40 50m 4-500 At, 1:1000 A3
0 4.0 20 3.0 40 som vere
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION” AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: swr ALTA PROJECTS PROJECT: POANWORK LONGITUDINAL SECTION
Drawn: SWT
Date: Juy2020 ABN, 611355330 PROPOSED SUBDIVISION ESTATE
Rev | DATE DESCRIPTION By | CHKD
Datum _AHD
ALTA
ENGINEERING : DESIGN : MANAGEMENT
26 Memorial Avenue, Cotton Tree
Email: [email protected]
Web: http://www.alta.net au
PO Box 559, Cotton Tree, QLD, 4558
Tel (07) 5475 4125 Fax (07) 5479 1607
At SHEET SIZE
FILENAME : A8539-POS ROADWORK LONG SECTION dwg -DATE : 19/11/20
‘15am - XREFS:X-Bas9; X-Sunvey
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
for TOTAL CONCEPT HOMES
nest
DRAWING No: 3 of 5
Revision
A6578/20/P03
Council Re
© This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed under the
Copyright Act, no part of i may in any form or by any means (electronic, mechanical, micro copying, photo-
copying, recording or otherwise) be reproduced, stored In a retrieval system or transmiltted without the prior
smitten permission of ALTA Projects, All intellectual property remains within 4LTA Projects, all enquiries should
be directed to ALTA Projects.
Section 13
192.701
3.786
192.281
192.277
3.500
3.626
189.899
189.901
3.500
3.577
3.0% 3.0%
188.635
-1.579
3.0% 3.0%
187.320
3.500
1:2
3.0%
Datum: RL 189.00 Datum: RL 187.00 Datum: RL 186.00
CH 50.000 CH 100.000 CH 150.000
191.559
191.466
6.599
3.500
192.416
3.500
3.0% 3.0%
1:2
188.998
3.0%
-2.181
187.829
3.500
1:2
3.0%
Datum: RL 189.00 Datum: RL 187.00 Datum: RL 186.00
CH 40.000 CH 90.000 CH 140.000
191.952
191.953
3.500
3.504
192.984
3.500
188.579
3.0% 1:2
3.500
190.280
-1.783
3.0% 1:2 1:2
3.0%
Datum: RL 190.00 Datum: RL 188.00 Datum: RL 186.00
CH 30.000 CH 80.000 CH 130.000
192.228
4.660
192.086
192.088
192.060
4.377
4.426
3.500
188.830
3.500
193.690
3.500
191.296
-1.330
1:2
3.0% 3.0% 1:2
3.0%
1:2 3.0%
3.0%
Datum: RL 191.00 Datum: RL 189.00 Datum: RL 186.00
CH 20.000 CH 70.000 CH 120.000
193.487
6.460
192.244
192.169
6.000
189.052
3.500
3.500
1:2
194.185
6.000
3.0% 3.0%
3.0%
3.0% 1:2
Datum: RL 192.00 Datum: RL 189.00 Datum: RL 186.00
CH 10.000 CH 60.000 CH 110.000
CROSS SECTIONS
SCALE 1:100 (A1), 1:200 (A3)
0 2 4 6 8 10 Meters
SCALE 1:100 (A1), 1:200 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORK CROSS SECTIONS
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6578/20/P04 4 of 5
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P04 ROADWORK CROSS SECTIONS.dwg - DATE : 19/11/20 - 11:53am - XREF's: X-Base; X-Survey Council Ref: ............
Section 14
REINFORCED CONCRETE NOTES: TESTING:
GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY, CONCRETE ACCESS DRIVEWAY DETAILS
SPECIFICATIONS IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.
AS 3600-1994 "SAA CONCRETE STRUCTURES CODE". THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
180mm CONCRETE SLAB (Fc=32MPa)
IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM :
(SL82 MESH WITH 50 TOP COVER) on 200mm CEMENT TREATED SUB
SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY: · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
BASE on COMPACTED SUBGRADE (100% STANDARD COMPACTION)
AS 1012 PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS) GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)
EXACT PAVEMENT DEPTHS TO BE DETERMINED BY GEOTECHNICAL
AS 3583.1,2,3,8 METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH ENGINEER.
MATERIALS FOR USE WITH PORTLAND CEMENT GRADE CAST ON ANY GIVEN DAY.
AS 3582.1 SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 5OM³ OR PART
WITH PORTLAND CEMENT- FLY ASH THEREOF CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.
AS 1141 METHODS FOR SAMPLING AND TESTING AGGREGATES ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE. NOTE:
AS 1302 STEEL REINFORCING BARS FOR CONCRETE IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING REFER TO LANDSCAPE ARCHITECT'S PLANS FOR CONCRETE
AS 1303 HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE SHALL BE TAKEN AFTER THE ADDITION OF WATER. FINISH / COLOURS. IF EXPOSED AGGREGATE IS SPECIFIED
AS 1304 HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR THEN THE CONTRACTOR MUST SUPPLY SAMPLES OF
AGGREGATE SIZE AND COLOUR FOR APPROVAL PRIOR TO
CONCRETE
PLACEMENT OF ANY CONCRETE PAVEMENT.
AS 3972 PORTLAND AND BLENDED CEMENTS
AS 1379 READY-MIXED CONCRETE (METRIC UNITS) CURING:
AS 2758 CONCRETE AGGREGATES ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER
AS 1478, 1479 CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN FINISHING.
CONCRETE
CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND
AS 3610 FORMWORK FOR CONCRETE TOOL FINISH CONCRETE
SHALL GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS : CUT EVERY SECOND BREAK SLAB FULL DEPTH
SUPPLY: · CONTINUOUS WATER PONDING. WIRE OF MESH WHILE STILL "GREEN"
· ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. · COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
· NO ON SITE BATCHING IS ACCEPTABLE. · APPLICATION OF AN APPROVED CURING COMPOUND.
· MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM
180
IN PLACE AND BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
· ALL MATERIALS, STORAGE, BATCHING, ETC TO CONFORM TO THE REQUIREMENTS
OF THE RELEVANT AUSTRALIAN STANDARDS. 200mm CTB
· ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.
· ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN. 200 UM VISQUEEN
· ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.
· ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE BOLSTER JOINT (BJ)
REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE. N.T.S.
· ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
· ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.
FORMWORK:
· ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD DOWEL SOCKETS TO
MANUFACTURERS SPEC. R16 GALVANISED DOWELS
OR STEEL FORMS.
OR EQUAL (600 LONG) AT 450 CTS
· ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 15O9 AND AS 151O.
· REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
SL82 MESH
FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE. 10mm ABELFEX OR EQUIV.
50 COVER
· ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
· ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE
180
CHAIRS TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE
UNDERLAIN BY WATERPROOF MEMBRANE.
200mm CTB
TRANSPORT : 300 300
200 UM VISQUEEN
ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.
CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT THE DOWEL JOINT (DJ)
ENGINEER'S DISCRETION.
N.T.S
PLACEMENT, COMPACTION AND FINISHING :
· CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M³, CONCRETE
PUMPING OR KIBBLING. UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW
HORIZONTALLY BY USE OF VIBRATORS.
· ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED,
IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS CONCRETE ACCESS DRIVEWAYS
DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
· ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 5OMM DIAMETER VIBRATORS.
· SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE SURFACE,
DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
· ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
WIND BREAKS, ETC MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
UNUSUALLY HOT, DRY OR WINDY CONDITIONS.
· ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.
· BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
· ALL CONCRETE TO BE ORDERED AND PLACED AT 8OMM SLUMP UNLESS NOTED OTHERWISE.
· NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORKS CONCRETE DETAILS
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . . Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
Tel (07) 5475 4125 Fax (07) 5479 1607 DRAWING No:
A6578/20/P05 5 of 5
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P05 CONCRETE DETAILS.dwg - DATE : 19/11/20 - 11:52am - XREF's: Council Ref: ............
The text continues on section 15.