Log in to see the plans as drawn REINFORCED CONCRETE NOTES: TESTING:
GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY, CONCRETE ACCESS DRIVEWAY DETAILS
SPECIFICATIONS IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.
AS 3600-1994 "SAA CONCRETE STRUCTURES CODE". THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
180mm CONCRETE SLAB (Fc=32MPa)
IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM :
(SL82 MESH WITH 50 TOP COVER) on 200mm CEMENT TREATED SUB
SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY: · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
BASE on COMPACTED SUBGRADE (100% STANDARD COMPACTION)
AS 1012 PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS) GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)
EXACT PAVEMENT DEPTHS TO BE DETERMINED BY GEOTECHNICAL
AS 3583.1,2,3,8 METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH ENGINEER.
MATERIALS FOR USE WITH PORTLAND CEMENT GRADE CAST ON ANY GIVEN DAY.
AS 3582.1 SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE · A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 5OM³ OR PART
WITH PORTLAND CEMENT- FLY ASH THEREOF CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.
AS 1141 METHODS FOR SAMPLING AND TESTING AGGREGATES ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE. NOTE:
AS 1302 STEEL REINFORCING BARS FOR CONCRETE IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING REFER TO LANDSCAPE ARCHITECT'S PLANS FOR CONCRETE
AS 1303 HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE SHALL BE TAKEN AFTER THE ADDITION OF WATER. FINISH / COLOURS. IF EXPOSED AGGREGATE IS SPECIFIED
AS 1304 HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR THEN THE CONTRACTOR MUST SUPPLY SAMPLES OF
AGGREGATE SIZE AND COLOUR FOR APPROVAL PRIOR TO
CONCRETE
PLACEMENT OF ANY CONCRETE PAVEMENT.
AS 3972 PORTLAND AND BLENDED CEMENTS
AS 1379 READY-MIXED CONCRETE (METRIC UNITS) CURING:
AS 2758 CONCRETE AGGREGATES ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER
AS 1478, 1479 CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN FINISHING.
CONCRETE
CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND
AS 3610 FORMWORK FOR CONCRETE TOOL FINISH CONCRETE
SHALL GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS : CUT EVERY SECOND BREAK SLAB FULL DEPTH
SUPPLY: · CONTINUOUS WATER PONDING. WIRE OF MESH WHILE STILL "GREEN"
· ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. · COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
· NO ON SITE BATCHING IS ACCEPTABLE. · APPLICATION OF AN APPROVED CURING COMPOUND.
· MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM
180
IN PLACE AND BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
· ALL MATERIALS, STORAGE, BATCHING, ETC TO CONFORM TO THE REQUIREMENTS
OF THE RELEVANT AUSTRALIAN STANDARDS. 200mm CTB
· ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.
· ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN. 200 UM VISQUEEN
· ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.
· ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE BOLSTER JOINT (BJ)
REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE. N.T.S.
· ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
· ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.
FORMWORK:
· ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD DOWEL SOCKETS TO
MANUFACTURERS SPEC. R16 GALVANISED DOWELS
OR STEEL FORMS.
OR EQUAL (600 LONG) AT 450 CTS
· ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 15O9 AND AS 151O.
· REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
SL82 MESH
FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE. 10mm ABELFEX OR EQUIV.
50 COVER
· ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
· ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE
180
CHAIRS TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE
UNDERLAIN BY WATERPROOF MEMBRANE.
200mm CTB
TRANSPORT : 300 300
200 UM VISQUEEN
ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.
CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT THE DOWEL JOINT (DJ)
ENGINEER'S DISCRETION.
N.T.S
PLACEMENT, COMPACTION AND FINISHING :
· CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M³, CONCRETE
PUMPING OR KIBBLING. UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW
HORIZONTALLY BY USE OF VIBRATORS.
· ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED,
IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS CONCRETE ACCESS DRIVEWAYS
DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
· ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 5OMM DIAMETER VIBRATORS.
· SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE SURFACE,
DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
· ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
WIND BREAKS, ETC MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
UNUSUALLY HOT, DRY OR WINDY CONDITIONS.
· ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.
· BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
· ALL CONCRETE TO BE ORDERED AND PLACED AT 8OMM SLUMP UNLESS NOTED OTHERWISE.
· NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORKS CONCRETE DETAILS
PRELIMINARY Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . . Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
Tel (07) 5475 4125 Fax (07) 5479 1607 DRAWING No:
A6578/20/P05 5 of 5
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539-P05 CONCRETE DETAILS.dwg - DATE : 19/11/20 - 11:52am - XREF's: Council Ref: ............
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.