22-05-23 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
FORM A — EARTHWORKS AND FUNCTIONAL (HYDRAULIC) STRUCTURES Purpose: To ensure earthworks bulking out, trimming and profiling and the key levels of functional (hydraulic) structures are in accordance with design drawings and specifications. The earthworks and structures dictate the movement of stormwater through the bioretention system and are a critical element in the function of the system. ITEMS CHECKED As constructed survey completed and | attached to this form Photos taken and attached to this form | Set-out of system is correct Base levels are at correct elevation (£50 mm) Base at correct grading (0.5%) fe SATISFACTORY es ACTION (IF UNSATISFACTORY) INITIAL Punch out holes in overflow pit are correct size, correct level and above invert level of outlet pipe (+25 mm) Overflow pit is correct size and crest and invert is at correct level (25 mm) Outlet pipe invert levels are correct (upstream and downstream) (£25 mm) Outlet pipe is free dra Overflow weir (if required) is correct length and at correct level +25 mm) | Overflow weir (if required) is keyed | into bund Bunds/embankments surrounding the system are at correct levels or above | HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached. Signed by superintendent: Print name: Date: Signed by bioretention designer: Print name: Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.