FORM B — UNDER-DRAINAGE Purpose: To ensure under-drainage is installed correctly before the bioretention media is installed. ITEMS Base of system free from debris Liner (typically filter cloth) correctly installed There is no fabric ‘sock’ around the under- drainage Correct under-drainage has been supplied and slotted at 2 mm or smaller Under-drainage pipes are laid at the correct spacing (small bioretention system 1.5 m, large system 2 m) Required grade (verified using level or string line) Under-drainage pipes laid at required grade (verified using level or string line to achieve design level 25 mm and 0.5% grade) CHECKED SATISFACTORY Alljunctions and connections have been appropriately sealed Top of clean out points at design level (i.e. approximately 50-150 mm above filter media surface ) ACTION (IF UNSATISFACTORY) HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB; As constructed survey and drawings and photos attached Signed by superintendent: Print name: Date: Signed by bioretention designer: Print name: Date: INITIAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.