FORM C — BIORETENTION MEDIA Purpose: To ensure that the media placed in the system meets the required specifications and that there is a record of the media being delivered to site. To ensure media layers are installed correctly and meet the design and specification requirements. SOURCING, TESTING AND SUPPLYING BIORETENTION MEDIA ACTION (IF DRAINAGE LAYER CHECKED SATISFACTORY, UNSATISFACTORY) INITIAL Meets the specifications | Meets the required hydraulic conductivity (4,000 mm/hr) Delivery supply docket certifies that the material delivered is the material tested (delivery docket attached) TRANSITION LAYER SUPPLY Meets the specifications Supplier certification provided (certification attached) Delivery supply docket certifies that the material delivered is the material tested | (delivery docket attached) | FILTER MEDIA SUPPLY Meets the FAWB's Guideline Specifications for Soil Media in Bioretention Systems (2008) Meets the required hydraulic conductivity (100-500 mm/hr, 750 mm/hr maximum) Frequency of laboratory testing completed in accordance with Section 3.5 (results of testing attached) Supplier certification provided (certification attached) Delivery supply docket certifies that the material delivered is the material tested (delivery docket attached) HOLD POINT: Superintendent or bioretention designer inspection and review of test results and certifications before proceeding. Comments (attach and refer to additional pages if necessary)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.