Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Approved Document OPW18-0342.01 Environment Management Plan Stage 2_Grasstree Court July 2021 (1)

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Ecological Management Plan – Grasstree Court – Lot 9


The site will undergo earthworks via an excavator to expose bare sand /soil for the translocation material to be placed
upon and spread. All vegetative debris (waste) scraped off the receiver site will also be stockpiled for a minimum of
three months or taken to the local waste facility.

Madeira vine was located on the rehabilitation site during the initial clearing for Stage 1. This invasive weed has been
cordoned off and will be treated separately in consultation with Council. It is proposed that the weed will be
consolidated into a stockpile, burned and covered with soil to be subsequently rehabilitated.

4.4 Receiving Site Planting and Habitat Creation
Planting of canopy trees to be undertaken to achieve the following:

     •      approval conditions regarding cockatoo feed trees
     •      establish canopy/minimise competition with groundcover species
     •      recreate woodland ecosystem
     •      enhance koala habitat (i.e. planting of locally occurring suitable feed trees) in the locality

Once the stage 2 area has been covered with the translocated soil material, a minimum 9 of an additional 300 she-oak
trees (part of the offset glossy black-cockatoo trees) will be planted in the area. A minimum of 50 eucalypt (and allied)
species will also be planted as tube stock during this stage.

This will allow for trees to be included within the maintenance period. As works progress, consultation with the
landscape contractor/ecologist and Council will determine the final number and location of trees to be planted.

Two Glossy Black-cockatoo nest boxes are to be installed in suitable trees as part of stage 1 rehabilitation.

4.5 Irrigation and Watering
A watering system is to be installed on the receiver site once stage 1 translocation works have been completed. It will
consist of a primary irrigation line to be installed along the top of the hill / western boundary of T1 and T2 with
secondary irrigation lines running from the main line throughout T1 and T2.

It will be connected to either a tank and pump system located at the northern point of T2 or connected via a pipeline
to a temporary water connection at the sewerage treatment plant. Water will be required to be trucked to fill tanks if
temporary water connection and access to recycled water from the sewerage treatment plant is not obtained.

Infrastructure is to be put in place after all earthworks machinery is no longer needed on the site. Final alignment of
infrastructure will be decided on ground based on local conditions once works have been completed. This system will
allow watering to be done on an as needed basis over the 5-year maintenance period.

The Receiving/Rehabilitation Site Set-out is provided 10 in FIGURE B4.




     9
         Note: Target is in the order of 500 trees and should be spread across Stage 1 and Stage 2 rehabilitation.
     10
          Set-out Figure updated with Harmony Landscapes and Biodiverse Environmental.
                                                                                                                      26
Log in to download the original file

Approved Document OPW18-0342.01 Environment Management Plan Stage 2_Grasstree Court July 2021 (1).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.