Approved Document OPW18-0342.01 Environment Management Plan Stage 2_Grasstree Court July 2021 (1)

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Ecological Management Plan – Grasstree Court – Lot 9



     5. REHABILITATION ESTABLISHMENT AND MAINTENANCE

Approval conditions require rehabilitation works to undergo a five-year maintenance period.

The On-Maintenance period is proposed to start once the stage 2 area within T2 area has received the translocated
soil treatment and the ecologist and Council has signed off on the works. Once the maintenance period has started,
photo monitoring points will be established for reporting purposes and operational works approval conditions.

In accordance with condition 12, the establishment of the vegetation offsets must be completed prior to the
commencement of the use of the first stage (i.e. Lot 6). As such, the “establishment” phase will be deemed
completed prior to the start of on-maintenance (i.e. once the initial practical works have been completed for stage 1
rehabilitation area and balance area weed management).

As time progresses, Stage 1 and Stage 2 rehabilitation works will be monitored and reported simultaneously.

Maintenance visits will occur every month for the first year. Each visit will involve recording presence or absence of
active regrowth/recruitment, photos from monitoring points, weed control requirements (including to the
surrounding buffer area), watering requirements, mulching requirements, sediment and erosion control, reporting
progress and any other items as needed.

This first year will determine whether the area requires enhancement planting dependent on the success of the
translocation works. Recommendations regarding further planting will be determined at the end of the first year and
will based on the rehabilitation performance.

For the balance of the maintenance period, quarterly maintenance visitation will occur (i.e. years 2-5) with recording
as per year 1.

At the end of the maintenance period it is proposed to have the area established with 90 - 95% native vegetation
cover and showing signs of returning to a self-sustaining ecosystem such as self-mulching, indications that all levels of
strata (ground, mid and canopy) are or likely to be present and fauna recruitment to the area (refer Section 6).




                                                                                                                      27
Log in to download the original file

Approved Document OPW18-0342.01 Environment Management Plan Stage 2_Grasstree Court July 2021 (1).pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.