Attachment I - Flood Assessment
Cooroy Hinterland Park Flood Assessment
4.2 Proposed Case
The proposed hinterland park has been incorporated into the TUFLOW model based on design
surface contour information by Form Landscape Architects. Various updates have been made to
the design surface as part of this investigation and these are outlined below.
• In some areas the design contours were found to extend into areas that will not
realistically be modified for the project (for example the vegetated banks of Cooroy
creek). These areas have been excluded from the design surface modelled and left as
per the existing state.
• The design surface was found to have high ground proposed along the northern side of
Maple Street and south of the proposed open space area. It was necessary to exclude
this high ground from the proposed case modelling because adverse flood impacts were
predicted. These areas have been left as per existing ground levels.
• Some minor lowering of surface levels along the northern boundary of the site have been
incorporated for flood level impact reduction.
• The design contour elevations have been globally reduced by 100mm to mitigate peak
flood level impacts.
Details of the updates to the proposed case design surface are shown on Image 4-1.
Image 4-1 Updates to the Proposed Design Surface Model
J00318R1V1 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Flood Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.