Original source · versioned page text
Minor Change Letter
GMA Certification Pty Ltd
Minor Change Element Statement of Compliance
(E) public notification if public notification was In accordance with the Decision Notice included in Part 3
not required for the development Existing Approvals the original application required
application. assessment by Council as a Material Change of Use (Code
assessable) application and therefore public notification
was not required.
The minor addition will not affect the level of assessment
in this instance.
5.0 Assessment against the Substantially Different Development Criteria
Table 2: Assessment against the Substantially Different Development Criteria
‘Substantially Different Development’ Criteria Statement of Compliance
A change may be considered to result in a substantially different development if the proposed change:
(a) involves a new use; or As indicated on the proposed plans this application will not involve
a new use.
(b) results in the application applying to a new As indicated on the proposed plans these minor additions are
parcel of land; or located wholly within the original subject site.
(c) dramatically changes the built form in terms As indicated on the proposed plans all works are either within or
of scale, bulk and appearance; or reduce the existing, approved building footprint.
Accordingly, it is submitted that the proposal does not
dramatically change the built form in terms of scale, bulk and
appearance.
(d) changes the ability of the proposed As indicated on the proposed plans the proposed amendments do
development to operate as intended; or not impact on nor change the ability of the proposed development
to operate as intended.
(e) removes a component that is integral to the The proposed amendments will not result in the removal of any
operation of the development; or component that is integral to the operation of the development.
(f) significantly impacts on traffic flow and the The all works are either within or reduce the existing, approved
transport network, such as increasing traffic building footprint which will not increase traffic to the site.
to the site; or
(g) introduces new impacts or increase the As indicated on the final architectural plans, the size, scale and
severity of known impacts; or intended use of the proposed amendments ensures that it will not
introduce new impacts or increase the severity of known impacts.
(h) removes an incentive or offset component The proposed amendments do not remove an incentive or offset
that would have balanced a negative impact component that would have balanced a negative impact of the
of the development; or development.
(i) impacts on infrastructure provisions. The proposed modifications will not impact on infrastructure
provision.
Should you have queries in relation to this Minor Change application please do not hesitate to contact Christie
Loy on 07 5578 1622 to discuss.
Kind regards,
Lisa McKay
Senior Town Planning Manager
BUrbanEnvPlanHons
GMA Certification Group
Phone: 07 5578 1622
Email: [email protected]
BUILDING APPROVALS & INSPECTIONS BUILDING CERTIFICATION FIRE SAFETY AUDITS Page 5 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original