Reference Documents RAL21 0035
Essential network infrastructure that is likely to fail to
function or may result in contamination when inundated by
Essential network infrastructure maintains effective function
flood water (e.g. water supply pipeline air valves and the
during and immediately after flood and storm tide inundation
like) is located above the DFE level (or where the DFE has
events.
not been modelled for the area, above the highest recorded The proposal does not result in new essential
flood level for the area). N/A network infrastructure
Essential community infrastructure
PO9 AO9.1
Essential community infrastructure is sited and constructed
Essential community infrastructure is able to function effectively to ensure that flood levels comply with flood immunity The proposal does not result in new essential
during and immediately after flood events. requirements specified in Table 8.2.6.4. N/A community infrastructure.
AO9.2
Essential community infrastructure which is located below The proposal does not result in new essential
the specified flood immunity requirements: N/A community infrastructure.
1. is designed and constructed to function effectively during
and immediately after the recommended flood level event;
and
2. has direct access to low hazard evacuation routes or an
emergency rescue area above the PMF, if it is for
emergency services (including emergency shelters, police
facilities, hospitals and associated facilities).
Earthworks
PO10 AO10
Future dwelling can be designed to comply,
Excavation and filling for operational works only occur where however no significant earthworks are expected to
Filling, other than accessways:
they: be required as the site has sufficient areas outside
Y of the DFE for a future dwelling
1. does not extend more than the equivalent of 3 metres
1. result in the protection, rehabilitation and repair of ecologically around the main building, measured from the outer walls of
important areas, watercourses, drainage lines and wetlands; the building;
2. do not adversely impact on the overall hydrology, hydraulics 2
2. is limited to a maximum of 500m ; and
and flood capacity of a waterway;
3. do not directly, indirectly or cumulatively cause adverse 3. does not impact on the local drainage of adjoining
impacts external to the site; properties.
4. do not cause increased flooding, which adversely affects the
safety or use of any land upstream or downstream;
5. do not cause ponding of water on the site or nearby land;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.