Table 7 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
for Emergency Spillways on Temporary Sediment Basins
Drainage Structure Anticipated Operation Design Life and Minimum
Design Storm Event
<3 Months 3-12 Months >12 Months
Emergency spillways on temporary 1 in 10 year 1 in 20 year 1 in 50 year
sediment basins ARI/10% AEP ARI/5% AEP ARI/2% AEP
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden runoff during construction and to achieve the objectives outlined in Tables 4-6. This is discussed
in the following section.
4.2.2 E ro sio n and Se dim en t Co ntr ol
Management of stormwater runoff during construction is necessary to avoid pollution of downstream
waterways from sediment and gross pollutant loading. Impacts of inadequate erosion and sediment
control downstream from the site include:
• traffic safety problems;
• blocked drains;
• local flooding problems;
• aesthetic pollution of drainage paths; and
• damage to local ecosystems.
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden runoff during construction. Erosion and sediment control plans shall be developed during detailed
design phase and must be continually maintained and amended as required to minimise environmental
harm.
Erosion and sediment control plans are based on three sets of control measures:
• drainage control;
• erosion control; and
• sediment control.
These control measures must be maintained in an effective operational condition. Sediment disposal
from site is to occur to the satisfaction of Noosa Council. Defects in erosion and sediment control
devices, such as sediment fences, are to be inspected and documented. Upon Inspection, the
Contractor is to determine whether the device should be replaced or repaired. Documentation is to
include how the damage was caused and what measures can be implemented to reduce the possibility
of repeat occurrences. Any damage to either permanent or temporary water quality control structures
or devices is to be immediately rectified at the contractor’s expense.
The effectiveness of the erosion and sediment control devices can be monitored by visual audits. All
ESC measures are to be inspected:
• at least daily (when work is occurring on site) or weekly (when work is not occurring on site);
• within 24 hours of expected rain; and
8
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.