Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

SUPERSEDED - Reference Documents - MCU25 0079

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                     •    within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise
                          sediment on site).
                 Drainage paths are to be inspected to ensure the sediment fences are not being bypassed as a result
                 of soil erosion.

                 Sediment laden runoff shall be prevented from entering neighbouring properties. This shall be achieved
                 by landscaping disturbed areas immediately and prior to a rainfall event.
                 The proposed development has scored a 15 on the IECA erosion hazard assessment with no trigger
                 score values exceeded (refer Appendix A for details). Further details of proposed on site erosion and
                 sediment control measures will be required at the detailed design phase of the development.
                 4.2.3 Ma int en an ce and M o nit o ri ng Re qui r em ent s

                 Periodic maintenance and monitoring of stormwater devices proposed in this report is crucial to ensure
                 effective operation and design life.

                 Inspect field inlet grates, pits and underground pipes for blockage or damage at least 6 monthly or after
                 significant rainfall event. Any installed filter baskets shall be inspected and maintained preferably by the
                 manufacturer to avoid damage to units and to ensure adequate cleaning and record keeping. For the
                 first 12 months routine inspections of filter baskets shall be carried out monthly with routine clean out
                 at alternate months. Results of the initial 12 months maintenance program shall be used to determine
                 future maintenance intervals. Refer manufactures maintenance and monitoring methodology for
                 specific details. Maintenance of ESC measures must occur in accordance with Table 7.




                                                                                                                           9
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
Log in to download the original file

SUPERSEDED - Reference Documents - MCU25 0079.pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.