Original source · versioned page text
response to information request - 22 delorme
4. Provide a Stormwater Management Plan that demonstrates how the increase
in hardstand will be managed to ensure rainwater will be controlled and
released without creating any adverse effects within the subject site and
neighbouring properties. The plan must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland).
Recor provides an updated catchment layout plan and stormwater management plan. The
plan includes stormwater inlet pits and connection to the existing stormwater network
along Safari St.
Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.