Development Application Part 2 of 2 - Geotech Report and Plans - OPW13/0816
Plans and drawings: the text below has words only, no drawings.
Very large file (18.0 MB): may take a few minutes to open.
~
~
Direct’Jts
S’li :-:;w’)(~y;;; E’l~iin;~B,jn9 Fty Umiied
f"’.i Dixon qHOI)!;) r-<pu~
!-;!::3c:<;;ists in i~{mlied :)n<)t’;~a::-::(:i: ~JTP:);..kil’’:: f<A.\)v)~~("~i!)"::’\!~f~^j. r~r:~""~{:’:",....:.1 ~
..-\....B.N. 7~; {.IS4 04.1 G::
MVGenJe Er.~ (CivU}i,,!8A CPf.r. ~ t,~;E }\tt~i! RPEO
G J Gmy
v.,-..;..;w. ${:H~~:;~V0’iS. (":~T:j,I;,
P Eliiinnl.cn 8EiCiv!!) fvn= AIl~ RPE(~.
h:;:~<;. ~i,~~*:;)
J ka~~s. 8E/~.:~(H:D::~;) f13:8
son.StUWfXS CP ~;cE::1$::-,:: 8f.=.r::~(C~vi}) RPEQ
Gold Coast Office
Job No: 113-15522
Ref: 1-15522,2013-09-26, LR VER 0
Author: Tim Phillips
26th September, 2013
G & KWhyte
6 Glendower Street
TOOWOOMBA OLD 4350
Email:[email protected]
ATTENTION: GRAHAM WHYTE
Dear Sir,
RE: 25 DOLPHIN CRESCENT, NOOSAVILLE -
FAILED REVETMENT WALL
1.0 INTRODUCTION
This report presents the results of a limited geotechnical investigation carried out
by Soil
Surveys Engineering Pty Limited at the above site on the 27th August and 24th September,
2013.
The investigation was carried out at the request of Noosa Jetty Builders on behalf of Graham
and Karen Whyte.
Authorisation to proceed with the investigation was dated 21st August, 2013.
The objective of this investigation was to assess site and subsurface conditions across the
Weyba Creek revetment to determine the failure mechanism responsible for the collapse of
the revetment and retaining walls, jetty and rear deck and to provide remedial options for
reinstatement, if required, and stabilisation of the revetment profile.
2.0 SITE HISTORY
It is understood movement and distress first became apparent about July, 2013 with rotation
of the jetty supports noted.
Complete failure and collapse of the jetty, revetment and retaining walls and section of the
rear timber deck is understood to have taken place in late July/early
August, 2013.
Temporary stabilisation of the exposed soil batter has since been carried out with a surfac-
ing of sprayed concrete across the batter face.
H :"~r.,;";:f;t:. G~,.!d ":::"::!:"~? ~.j~,.r,:~(":’Y!’: [,:,:;("::’:c,
f..::!:".~:;,~":V
!.’~:,."’::: :~’ :~i ::!:’:r;":~,:~ S:’:’:::.;::~ U::::~, -: ’if: ~Jq:::::~,:.\ :}:’t." 1 ~::l,l,~ ::’:;~’f’1 :.~~i~ -:r:, ~-:.~~ C:::’~;t::c::1;~’~~ ;.:i’~’~;::
:--I~::~;’J:: :’;.::~ t-:pj1’p::,’1;l~ G::’J (:.:~,:,-3:::: ,’~:"r::,~ 7i~:: ’:’;-,,,:;:~:~~ :’:~,~)~;:, s..::;,:~:-: :’~ ""’~.: (.’~-:’;~:’:’
~)’:’: :!.::"{, :;,~ ’.’> f,’f.~ ~1",:7 :S!’~..:’:;: (,()i?: :., ~,;::~;f, j’:::’.::’,:$!::l
p~~~,::: :t;::::" ~..:::~: .;:’ >: H:,:::~-::::!’~’".!’:d.:~ ’;’ .(~, ~:;kj ~ 212.. f,,~:::.;.::-.:!.’y ~";:~":. Q::: .::’--; :
/:,:.r’::.:’,~::;.~ .....:.:{..~:’;..::;; f~t::~~r.:)::.:-:
~’;.?’l .:, ’: ’;’ }.:~’f::: ~/;:’;i; .’:’: 7:’:? :;=.::;:) :::,~t1;-: :"r: :.;~.? ,~ :1~/.’i.’:!’=.:f ;-:.r: ~; :(’ ~:{:.:~:~ ~:/. :t:
):;::x :: n J.-t:!,:;-:’ ~:~if:~} F..) :;V::’ :;:.i!J:~ :,~.~::.’" !;:;>.< 61’... .:",,r. :J~:.,’i!;:) ):3’’>: i.!:.... !;~:./1; ,:~::~::
~..;’!-’.,~...:~~::;’ ~A’..!’;;:::.. ::’\’:’:)’~.:~,";I-=-:.:’::$ t~t~k~~’:~~,~~~(~~’::~,iJ:’J:g ,-=- y~.., ~,~,!,~:. .:;1.: !’..:-d~e:’:,::,:\!:’::’~~!i;;:;;(~::~::.:: ’..-(~.....~: ~. ~~:,~..~,:
f:::.:~’ V:,:y~~{:t-.:,>:!:::;.t:..,~:-~ .....~’:~~ .~~~: :’:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Geotech Report and Plans - OPW13/0816Related documentApplication case desk ↗
About this file
- File size
- 18.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.