Job No. 213-15522
3.0 WALL CONSTRUCTION
Provided site photographs and site inspections indicated that the revetment wall construction
comprised a low height cast insitu concrete wall constructed on a short corrugated fibro
sheet cut off wall. A three course blockwork retaining wall, with soil backfill, to have
appears
been constructed on the revetment wall at a later date with a timber deck
supported on a
high level footing system constructed behind the retaining wall.
4.0 GEOTECHNICAL INVESTIGATION
Subsurface conditions were assessed with four boreholes carried out from a work
boat,
using hydraulically driven window sampling equipment and supplemented with Continuous
Dynamic Cone Penetrometer tests (DCP’s)with three DCP’s carried immediately behind the
temporary shotcreted revetment batter.
Borehole depths ranged from 2.0m to 3.0m below existing creek bed levels. DCP tests were
terminated at near penetration refusal at depths of 1.5m to 3.0m below
existing creek bed
levels and 4.5m to 4.8m below the existing ground levels behind the
temporary
revetment
batter.
The field investigation, soil classification descriptions and field tests were carried out in
general accordance with Australian Standards.
AS 1726-1993 Geotechnical Site Investigation
AS1289 Method of Testing Soils for Engineering Purposes
Notes relating to this report, Borehole Record Sheets, DCP test results and an Aerial
Photograph/Site Plan detailing the location of boreholes are appended to this report.
Field work was carried out on the 27th August and 24th September, 2013.
Water levels were also recorded at varying offsets from the rear of the
property to provide a
general profile of the Weyba Creek bed immediately offset from the failed revetment wall
location. The results are presented in brackets on the appended Aerial
Photograph/Site
Plan.
4.1 Subsurface Profile
The subsurface profile encountered in Boreholes 1, 3 and 4, comprised
very loose sand
extending to depths of about 1.2 to 1.8m overlying medium dense to dense sand.
At Borehole 2 location medium dense sands extended to about 1.2m and
overlay dense
conditions. The encountered very loose upper level subsurface profile is
generally typical of
active marine alluvial deposition process.
DCP’s 5 to 7, located immediately behind the remaining revetment batter, encountered
very
loose to loose and variable conditions to depths of 1.4m to 2.3m medium dense to
overlying
dense conditions. The DCP’s were terminated at near penetration refusal in dense strata at
depths of 4.5m to 4.8m below existing ground surface levels.
-;;: SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Geotech Report and Plans - OPW13/0816Related documentApplication case desk ↗
About this file
- File size
- 18.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.