IPart 3 Acid sulfate soils
              -                                             ~




3.1          Is the natural ground level of any point where work is being carried out less than 20 metres                                                    ~


             Australian Height Datum (AHD)?




IDNa I.
                         End of part 3 of this checklist.

 C8:I Yes

                                                                                                                              ’J!     ;;;’
3.2          Does the proposed operational work involve the following?


excavating more than 1000 cubic metres of soil or sediment at or below five metres
                                                                                                                          DYes                  ~ No
AHD

 using more than 1000 cubic metres or more of material with an average depth of 0.5
                                                                                                                          DYes                  ~ No
 metres on land, soil or sediment at or below five metres AHD


.            If yes to any of the above, then this application requires assessment by the Department of Environment and
             Resource Management as an advice agency.


Section reference:
             Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
             State planning policy 2/02: planning and managing development involving acid sulfate soils, section 3.6


                                                                ;~   -


                                                                               1;:1   Lj;o,   .
                                                                                                                  V


 Part 4       -   Easements and Substations                     .
                                                                         I


                                                                             .~w.~                ~
                                                                                                      ..,
                                                                                                      ~     a""       ~’~~~’ ~~ ~-’}-~~l-~_~I:~., :~;:~ :~~~~:~~~~
                                                                                                            ~




4.5          Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
             1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
        ’"
             strategic pipeline?


 C8:I No          .      End of part 4 of this checklist.

 DYes             .      This application requries assessment by the pipeline licence holder as an advice agency.


 Section reference:
.            Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b)and 17


Ipart 8 Taking or interfering with water
              -
                                                                                                                                                    a
                                                                                                                                                     ~
                                                                                                                                                         a
                                                                                                                                                             ~.




8.8          Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
             water)?


 C8:I No

                  .      You must complete Taking artesian or sub-artesian water -IDAS form 12.
 DYes             .      This application requires assessment by the Department of Environment and Resource
                         Management as a concurrence agency.


 8.9         Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?




                  I.
        Na               Go to question 8.12.

I :8J
 DYes




                                                                                                                        Operational works IDAS checklist 4
                                                                                                                                                -




                                                                                                                                    Version 1.0 December 2009


[OCR of page images]
DIO

Part 3 - Acid sulfate soils

 

 

 

3.1 Is the natural ground level of any point where work is being carried out less than 20 metres
Australian Height Datum (AHD)?

 

 

[-] No ° End of part 3 of this checklist.
XX] Yes

 

 

 

 

3.2 Does the proposed operational work involve the following?

 

 

roti more than 1000 cubic metres of soil or sediment at or below five metres CYes No

using more than 1000 cubic metres or more of material with an average depth of 0.5
metres on land, soil or sediment at or below five metres AHD

 

Yes &] No

 

 

 

 

° If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as an advice agency.

Section reference:
° Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
. State planning policy 2/02: planning and managing development involving acid sulfate soils, section 3.6

 

Part 4 - Easements and Substations

 

 

4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
strategic pipeline?

 

 

XX] No ° End of part 4 of this checklist.

 

 

 

 

C1 Yes ° This application requries assessment by the pipeline licence holder as an advice agency.

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17

 

[Part 8 - Taking or interfering with water

 

 

8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?

 

 

—XJNo

 

° You must complete Taking artesian or sub-artesian water - IDAS form 12.
(CYes ° This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.

 

 

 

8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?

 

 

X] No ° Go to question 8.12.
C] Yes

 

 

 

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Log in to download the original (Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.