Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4

of 20

Page text read automatically using OCR, there may be inaccuracies

DDD
8.12      Is any of the proposed operational work for any thing constructed or installed that allows, under the
          Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
          pump water)?


                       Go to question 8.14

I~NO
p    I.
    Yes



8.14      Does any of the proposed operational work for any thing constructed or installed that allows, under
          the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
          water)?



I~NO I.
                       Go to question 8.19

DYes
                                                                                                                     ,_
                                                                                                               t.I
                                                                                                                          II
8.19      Is the proposed operational work for the following?                                ~




for the construction of a referable dam as defined under the Water Supply (Safety
                                                                                                 DYes          ~ No
and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent                     DYes          ~ No


.         If yes to any of the above you must complete Referable dam IDAS form 16.
                                                                           -




          This application requires assessment by the Department of Environment and Resource Management
          (DERM).If DERM is not the assessment manager for the application, the role of the agency will be as a
          concurrence agency and you must give DERM a copy of the application


Section reference:
.         Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
.         Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
          Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
          Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
          with subartesian water as assessable)
.         Wild Rivers Act 2005, section 43A
.         Wild Rivers Code (note:this code does not currently contain applicable provision for taking or interfering with
          artesian water)
.         Relevant wild river declarations


Notes for completing this form:
          Applicant details IDAS form 1 and Development application assessment IDAS checklist 1 must be
                            -
                                                                                         -




          completed for all development applications to be considered.
.         The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.


Privacy   -
              please refer to the assessment manager for further details on the use of information recorded in
this form.


Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.




                                                                                             Operational works IDAS checklist 4
                                                                                                              -




                                                                                                     Version 1.0 December 2009


[OCR of page images]
 

LO

8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?

 

 

 

x] No ° Go to question 8.14
L] Yes

 

 

 

 

8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?

 

 

XX] No ° Go to question 8.19
LJ Yes

 

 

 

 

8.19 Is the proposed operational work for the following?

 

 

 

 

 

 

for the construction of a referable dam as defined under the Water Supply (Safety CO Yes No
and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent OO Yes I No
. If yes to any of the above you must complete Referable dam - IDAS form 16.

. This application requires assessment by the Department of Environment and Resource Management

(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application

Section reference:

. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4

e Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4

. Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11

e Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering

with subartesian water as assessable)

. Wild Rivers Act 2005, section 43A

° Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)

° Relevant wild river declarations

Notes for completing this form:

° Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.
. The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Log in to download the original (Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.