Original source · versioned page text
2019-07-09 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
13. Any new hot water systems installed shall be either solar systems; electric heat
pump systems; or gas systems (LPG or natural).
14. Any new kitchen, laundry and bathroom fittings are to comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient
Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water
Conservation Rating System. All tap ware and shower roses shall not exceed a
maximum flow of 9 litres per min. Dishwashers and washing machines are
excluded from this requirement.
15. Deleted.
16. The development shall be undertaken in accordance with the recommendations of
the Acoustic Report prepared by TTM Consulting (SC) Pty Ltd.
17. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
must be submitted, to secure performance of all conditions of this approval, prior
to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit.
18. The requirements of this development approval are to be effected, prior to the use
of the premises. Council reserves the right to call upon the bond or guaranteed
sum referred to in this approval to effect compliance with conditions.
19. The Development Permit for a Material Change of Use and Reconfiguring a Lot
lapses if the use has not happened by 17 February 2014, unless an application to
extend the currency is approved by Council.
20. The developer must obtain all of the other Development Permits referred to in the
Decision Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Reconfiguring a Lot
21. The lot reconfiguration shall be in accordance with plan SP196846 as submitted
by Jones Flint & Pike Pty Ltd except as modified herein.
22. In conjunction with the lodgement of the Plan of Survey for Council endorsement,
legal documentation shall be presented to Council and shall be submitted in the
correct form with the fees prescribed in Council's adopted fee schedule.
23. Pursuant to Section 3.7.3(3)(c) of the Integrated Planning Act, all outstanding rates
and charges due and payable to Noosa Council in respect of the lots being
reconfigured shall be paid prior to endorsement of the Plan of Survey.
24. The applicant shall provide a 2m by 2m truncation on each corner of Lot 4 adjacent
to Lot 1 on RP802360 on either side of Council's pathway to assist service vehicle
access. An underground electricity service shall be provided to service all parts of
Lot 4 if not already provided. The service shall be provided before the use
commences.
25. All parts of lot 4 shall be serviced by water supply appropriate for necessary
requirements, such as firefighting. The service shall be provided before the use
commences.
Vehicle Access
26. The eastern site access intersection shall be modified to increase the length of the
parallel right turn storage lane to at least 20 metres.
Page 15 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.