Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-07-09 Planning & Environment Committee Agenda

of 128

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  9 JULY 2019


    13.   Any new hot water systems installed shall be either solar systems; electric heat
          pump systems; or gas systems (LPG or natural).
    14.   Any new kitchen, laundry and bathroom fittings are to comply with the AAA Water
          Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient
          Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
          Drainage Standard Part 1.2), with toilets to comply with the AAAA Water
          Conservation Rating System. All tap ware and shower roses shall not exceed a
          maximum flow of 9 litres per min. Dishwashers and washing machines are
          excluded from this requirement.
    15.   Deleted.
    16.   The development shall be undertaken in accordance with the recommendations of
          the Acoustic Report prepared by TTM Consulting (SC) Pty Ltd.
    17.   Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
          must be submitted, to secure performance of all conditions of this approval, prior
          to the issue of a Development Permit for Operational Works. The cash bond or
          trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit.
    18.   The requirements of this development approval are to be effected, prior to the use
          of the premises. Council reserves the right to call upon the bond or guaranteed
          sum referred to in this approval to effect compliance with conditions.
    19.   The Development Permit for a Material Change of Use and Reconfiguring a Lot
          lapses if the use has not happened by 17 February 2014, unless an application to
          extend the currency is approved by Council.
    20.   The developer must obtain all of the other Development Permits referred to in the
          Decision Notice, prior to obtaining a Development Permit for Building Works.
    Land Development
    Reconfiguring a Lot
    21.   The lot reconfiguration shall be in accordance with plan SP196846 as submitted
          by Jones Flint & Pike Pty Ltd except as modified herein.
    22.   In conjunction with the lodgement of the Plan of Survey for Council endorsement,
          legal documentation shall be presented to Council and shall be submitted in the
          correct form with the fees prescribed in Council's adopted fee schedule.
    23.   Pursuant to Section 3.7.3(3)(c) of the Integrated Planning Act, all outstanding rates
          and charges due and payable to Noosa Council in respect of the lots being
          reconfigured shall be paid prior to endorsement of the Plan of Survey.
    24.   The applicant shall provide a 2m by 2m truncation on each corner of Lot 4 adjacent
          to Lot 1 on RP802360 on either side of Council's pathway to assist service vehicle
          access. An underground electricity service shall be provided to service all parts of
          Lot 4 if not already provided. The service shall be provided before the use
          commences.
    25.   All parts of lot 4 shall be serviced by water supply appropriate for necessary
          requirements, such as firefighting. The service shall be provided before the use
          commences.
    Vehicle Access
    26.   The eastern site access intersection shall be modified to increase the length of the
          parallel right turn storage lane to at least 20 metres.


                                                                               Page 15 of 128
Log in to download the original file

2019-07-09 Planning & Environment Committee Agenda(PDF, 13MB).pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.