Council archive · source document
Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published] · MCU21/0027.02
Plan No. Rev. Plan/Document Name Date
31026-OW3.1 A Earthworks Plan 22/03/2021
Prepared by SCG Consulting Engineers
(AS ANNOTATED IN RED BY COUNCIL)
31026-OW5.1 A Sewer and Stormwater Protection Plan 22/03/2021
Prepared by SCG Consulting Engineers
(AS ANNOTATED IN RED BY COUNCIL)
31026-OW6.1 A Driveway and Access Plan 22/03/2021
Prepared by SCG Consulting Engineers
(AS ANNOTATED IN RED BY COUNCIL)
31026-OW6.2 A Driveway Levels Plan 22/03/2021
Prepared by SCG Consulting Engineers
(AS ANNOTATED IN RED BY COUNCIL)
31026-SW1.1 A Stormwater Management Plan 22/03/2021
Prepared by SCG Consulting Engineers
(AS ANNOTATED IN RED BY COUNCIL)
31026-C1.1 A Stormwater Relocation Plan 22/03/2021
D Prepared by SCG Consulting Engineers 14/09/2023
31026-C1.2 N/A Pipe Long Sections September
2023
Prepared by SCG Consulting Engineers
11 DA5 Landscape - Trees, prepared by Braeden 7/5/21
Constructions and as annotated by
Council
12 DA5 Landscape - Ground, prepared by Braeden 7/5/21
Constructions and as annotated by
Council
13 DA5 Landscape – Roof Garden, prepared by 7/5/21
Braeden Constructions and as annotated
by Council
OPW21/0047 Condition 45 – On Maintenance
Applicant’s Request
That the amended stormwater design be accepted by Council.
Assessment of Request
Page 5 of 8
Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.