Original source · versioned page text
ATTCH 2 - IR Response - Ecological and Bushfire IR Response (Cardno)
Attached to the e-mail RAL17/0501 IR Response email 1 of 4.
The original of this document is very large (15.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
Cr
DATE PLOTTED: 13 November 2017 3:42 PM BY : JOHN DELANEY
ee
k VEGETATION MANAGEMENT PLAN - CONSTRUCTION PHASE
Y
WA
Ed
ge
Objectives:
of Creek
W
Manage construction phase operations so as to:
D LO
Cov P
x protect indigenous vegetation and fauna habitat identified for
retention;
DAVI
x reinstate indigenous vegetation in areas subject to temporary
disturbance; and
711
x
Cov H
undertake a comprehensive program of weed control works.
Cov Q
712
COASTAL RESERVE
Specifications:
(COUNCIL MANAGED)
Cov J
Cov R
Vegetation management is to be implemented in accordance with the
713
Cov K
specifications provided in WE17035-CVMP-002.
Cov S
714
LEGEND
Cov L
Vegetation Clearance and Construction Zone : 0.60 hectares (62%)
T
Cov
715
Cov U
Cov M
Bulk Earthworks
Proposed
Water Meters
Vegetation Retention and Habitat Enhancement Zone: 0.33 hectares (34%)
716
7
Temporary Vegetation Clearance and Restoration Zone: 0.04 (4%)
Proposed Access Sight-line Clearance Vegetation Regrowth Management Zone : 0.06 hectares
Existing Access Sight-line Clearance Vegetation Regrowth Management Zone (for comparison purposes only): 0.04 hectares
Cov N
Cov V
Permanent Beach and Riparian Buffer Access Restriction Fencing
Temporary Vegetation Protection / Access Restriction Fencing
Cov T Statutory Covenant Reference Code
712 Lot Reference Number
CAD File: I:\WE Jobs 2017\WE17035 - Castaways Beach\Acad\WE17035-CVMP-001 v1.dwg
Translocation of Fig (if required)
XREF's: X-790400-EWK-Depth-OPT2; 116052 Lots; X-790400-LOTS
0 10 20 30 40 50m
SCALE 1:500 @A1
Drawn Date Client
JD 10 NOVEMBER 2017 KENLYNN PTY. LTD.
© Cardno Limited All Rights Reserved. Checked Date Project Status
LOT 71 ON MCH2854 CASTAWAYS BEACH
This document is produced by Cardno Limited solely for the
JD 10 NOVEMBER 2017
PRELIMINARY
benefit of and use by the client in accordance with the
Designed Date RESIDENTIAL SUBDIVISION NOT TO BE USED FOR CONSTRUCTION PURPOSES
terms of the retainer. Cardno Limited does not and shall not DATUM GRID Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (Qld) Pty Ltd | ABN 57 051 074 992
Level 11, 515 St Paul’s Terrace
Title
VEGETATION MANAGEMENT PLAN A.H.D. AS SHOWN A1
party arising out of any use or reliance by third party on the Approved
Fortitude Valley, QLD 4006 Drawing Number Revision
content of this document. CONSTRUCTION PHASE
Rev. Date Description Des. Verif. Appd.
Tel: 07 3369 9822 Fax: 07 3369 9722
Web: www.cardno.com.au
WE17035-CVMP-001 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.