Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

ATTCH 2 - IR Response - Ecological and Bushfire IR Response (Cardno)

Attached to the e-mail RAL17/0501 IR Response email 1 of 4.

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

                                            DATE PLOTTED: 13 November 2017 3:43 PM BY : JOHN DELANEY




                                                                                                                                                                                                                                                                                                           g) If removal of the fig tree is required to achieve acceptable sight lines, the tree is to be translocated to the existing
                                                                                                               CONSTRUCTION PHASE VEGETATION MANAGEMENT SPECIFICATIONS                                                                                                                                        Site access way. Details confirming translocation requirements and methods, provided by an appropriately
                                                                                                                                                                                                                                                                                                              qualified and experienced arborist, are to be contained within the detailed Operational Works plans and are to be
                                                                                                               Key Definitions
                                                                                                                                                                                                                                                                                                              submitted to Council for approval.

                                                                                                               Environmental Weed means a plant species listed in the following standards and legislation or current updates:
                                                                                                                                                                                                                                                                                                           h) Following completion of the UXO clearance inspections within the Vegetation and Habitat Protection Zone a
                                                                                                                 - Declared Restricted plants under the Biosecurity Act 2014.                                                                                                                                 program of supplementary planting works is to be completed. Species selection and planting densities are to be
                                                                                                                 - Weeds of National Significance (WoNS).                                                                                                                                                     designed to reflect the structure and species composition of RE12.2.14 and RE12.2.5.
                                                                                                                 - Sunshine Coast Local Government Area Pest Management Plan 2012-2016 sections 6.2.2, 6.3.2, 6.4.2, 6.5.2 and 6.6.2, as
                                                                                                                   updated from time to time, a copy of which can be obtained from Council Offices.                                                                                                        i) All mulch and plant stock used in the weed control and supplementary planting program is to be certified as weed
                                                                                                                                                                                                                                                                                                              free.
                                                                                                               Indigenous Vegetation means native vegetation which historically has naturally occurred in the local area.
                                                                                                                                                                                                                                                                                                           j) Initial weed control and supplementary planting works are to be maintained by the developer for a period of 12
                                                                                                               Native Fauna means native animals which historically have naturally occurred in the local area.                                                                                                months and thereafter are to be maintained in accordance with the terms and conditions of the Operational Phase
                                                                                                                                                                                                                                                                                                              VMP (WE17035-OVMP-001 to 002).
                                                                                                               Vegetation means: any tree, shrub, bush, vine, grass or other living or dead plant material on the Covenant Area other than existing
                                                                                                               structures such as fences and poles existing at the Home when this Covenant comes into force and timber imported into the                                                              Temporary Vegetation Clearance and Restoration Zone
                                                                                                               Covenant Area to be used for maintenance of such existing structures.
                                                                                                                                                                                                                                                                                                           a) The alignment of the sewer connection located within the Temporary Vegetation Clearance and Restoration Zone is to
                                                                                                               UXO means unexploded ordinance.                                                                                                                                                                be adjusted as required to minimise the loss of established trees.

                                                                                                               Vegetation and Habitat Protection Zone
                                                                                                                                                                                                                                                                                                           b) Where excavation / trenching works impact on the root systems of vegetation identified for retention then the following
                                                                                                                                                                                                                                                                                                              work practices will be implemented:
                                                                                                               A detailed Vegetation and Habitat Protection and Enhancement Plan is to be prepared for all land located within the Vegetation and
                                                                                                               Habitat Protection Zone and the Temporary Clearance and Restoration Zone and is to be submitted in support of Operational
                                                                                                                                                                                                                                                                                                           - Tree roots in excess of 50mm diameter should not be cut.
                                                                                                               Works Applications. That Plan is to be prepared in accordance with the SEQ Restoration Framework (Chenoweth EPLA & Bushland
                                                                                                               Restoration Systems, 2012).                                                                                                                                                                 - Damaged tree roots should be saw cut back to a clean cut, and all cuts, nicks etc. are to be cleaned and trimmed to
                                                                                                                                                                                                                                                                                                                green wood.
                                                                                                                                                                                                                                                                                                           - Hand digging and tunneling should be used whenever possible to avoid cutting roots, especially under the canopy of
                                                                                                               At a minimum the Plan will include provision for the following management measures.
                                                                                                                                                                                                                                                                                                                trees.
                                                                                                                                                                                                                                                                                                           - Trenches dug under the canopy of trees are to remain open for as short a time as possible.
                                                                                                                     a)   Prior to the commencement of any vegetation clearance and earthworks the boundaries of the Vegetation and Habitat
                                                                                                                                                                                                                                                                                                           - Trenches should be carefully backfilled, consolidated and watered in around roots to eliminate voids and exposed
                                                                                                                          Protection Zone shall be surveyed and clearly defined.
                                                                                                                                                                                                                                                                                                                roots are to be kept moist and covered with Hessian for the duration of the exposure.

                                                                                                                     b)   A 1.8m high temporary vegetation protection and access restriction fencing shall be established around the boundaries of                                                         m) Following completion of necessary vegetation clearance, earthworks, building demolition and civil engineering
                                                                                                                          the Vegetation and Habitat Protection Zone and along the alignment of the Permanent Beach and Riparian Buffer                                                                      works - the Temporary Vegetation Clearance and Restoration Zone is to be revegetated in accordance with the
                                                                                                                          Access Restriction Fencing as indicated on Drawing Ref: WE17035-CVMP-001 prior to the commencement of broadscale                                                                   specifications of the Council approved Vegetation and Habitat Protection and Enhancement Plan.
                                                                                                                          vegetation clearance, earthworks and building demolition works. This fencing is to be maintained for the duration of the
                                                                                                                          construction phase of development.                                                                                                                                          Vegetation Clearance and Construction Zone and Proposed Access Sight-line Clearance Vegetation Regrowth
                                                                                                                                                                                                                                                                                                      Management Zone
                                                                                                                     c)   No storage of materials or equipment is to be permitted within the Vegetation and Habitat Protection Zone.
                                                                                                                                                                                                                                                                                                           a) An accredited (holder of a current Rehabilitation Permit issued by the Environmental Protection Agency under Section
                                                                                                                                                                                                                                                                                                              275(d) of the Nature Conservation Regulation 1994) wildlife spotter-catcher will be appointed to supervise and direct,
                                                                                                                     d)   Access to the Vegetation and Habitat Protection Zone is prohibited except for authorized management and UXO                                                                         if required to avoid injury or harm to fauna, the vegetation clearing operations.
                                                                                                                          clearance purposes.
                                                                                                                                                                                                                                                                                                           b) Vegetation clearance works are to be carried out under the direction of the UXO clearance contractor.
                                                                                                                     e)   An initial program of weed control works is to be completed within the Vegetation and Habitat Protection Zone to
                                                                                                                          remove existing infestations of Environmental Weeds and non-indigenous vegetation prior to the conduct of UXO                                                                    c) Where felling of a tree may damage vegetation identified for retention, directional felling must be undertaken to direct
                                                                                                                          clearance inspections. All weed material is to be taken off-site for lawful disposal.                                                                                               tree fall away from the retained vegetation.

                                                                                                                     f)   No additional vegetation clearance works are to be carried out within the Vegetation and Habitat Protection Zone for                                                             d) Cleared vegetation is to be removed from the Site for lawful disposal due to the high level of non-indigenous species
                                                                                                                                                                                                                                                                                                              content and associated potential for spread of weeds if the material.
CAD File: I:\WE Jobs 2017\WE17035 - Castaways Beach\Acad\WE17035-CVMP-001 v1.dwg




                                                                                                                          the purpose of completing the UXO clearance inspections, UNLESS specifically authorised by Council.

                                                                                                                                                                                                                                                                                                      Permanent Beach and Riparian Buffer Access Restriction Fencing
                                                                                                                     g)   If removal of the fig tree required to achieve acceptable sight lines, the tree is to be translocated to the existing Site
                                                                                                                          access way. Details confirming translocation requirements and methods, provided by an appropriately qualified and
XREF's: X-790400-EWK-Depth-OPT2; 116052 Lots; X-790400-LOTS




                                                                                                                                                                                                                                                                                                           e) At the completion of all civil works a 1.5m high, black, pool-style, gate free fence is to be established along the coastal
                                                                                                                          experienced arborist, are to be contained within the detailed Operational Works plans and are to be submitted to Council
                                                                                                                                                                                                                                                                                                              and riparian buffer boundaries, as shown in Drawing Ref: WE17035-CVMP-001.
                                                                                                                          for approval.


                                                                                                                                                                                                                                                                                                                                        Drawn                  Date Client
                                                                                                                                                                                                                                                                                                                                         JD        10 NOVEMBER 2017         KENLYNN PTY LTD
                                                                                                                                                                                                                              © Cardno Limited All Rights Reserved.                                                                     Checked                Date Project                                     Status
                                                                                                                                                                                                                                                                                                                                                                            LOT 71 ON MCH2854 CASTAWAYS BEACH
                                                                                                                                                                                                                           This document is produced by Cardno Limited solely for the
                                                                                                                                                                                                                                                                                                                                         JD        10 NOVEMBER 2017
                                                                                                                                                                                                                                                                                                                                                                                                                                    PRELIMINARY
                                                                                                                                                                                                                              benefit of and use by the client in accordance with the
                                                                                                                                                                                                                                                                                                                                        Designed               Date         RESIDENTIAL SUBDIVISION             NOT TO BE USED FOR CONSTRUCTION PURPOSES
                                                                                                                                                                                                                           terms of the retainer. Cardno Limited does not and shall not                                                                                                                         DATUM            GRID    Scale      Size
                                                                                                                                                                                                                                                                                                                                        Verified             Date
                                                                                                                                                                                                                           assume any responsibility or liability whatsoever to any third   Cardno (Qld) Pty Ltd | ABN 57 051 074 992
                                                                                                                                                                                                                                                                                                 Level 11, 515 St Paul’s Terrace
                                                                                                                                                                                                                                                                                                                                                                    Title
                                                                                                                                                                                                                                                                                                                                                                            VEGETATION MANAGEMENT PLAN              A.H.D.               AS SHOWN          A1
                                                                                                                                                                                                                           party arising out of any use or reliance by third party on the                                               Approved
                                                                                                                                                                                                                                                                                                    Fortitude Valley, QLD 4006                                                                                  Drawing Number                             Revision
                                                                                                                                                                                                                                             content of this document.                                                                                                      CONSTRUCTION PHASE
                                                                                                       Rev.   Date                Description          Des.   Verif. Appd.
                                                                                                                                                                                                                                                                                              Tel: 07 3369 9822 Fax: 07 3369 9722
                                                                                                                                                                                                                                                                                                     Web: www.cardno.com.au
                                                                                                                                                                                                                                                                                                                                                                                                                         WE17035-CVMP-002                       1
Log in to download the original file

ATTCH 2 - IR Response - Ecological and Bushfire IR Response (Cardno).pdf · 15.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.