Skip to the record
The gold standard in government transparency.

Original source · versioned page text

ATTCH 2 - IR Response - Ecological and Bushfire IR Response (Cardno)

Attached to the e-mail RAL17/0501 IR Response email 1 of 4.

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

: WE17035                                                                    8
13 November 2017


                 removing existing residential structures and landscaping that are currently located within that
                 buffer area.

           b) retaining aquatic and terrestrial habitat in riparian zones – with existing native vegetation, aquatic
              and terrestrial habitats being retained and enhanced within the proposed 50m wide riparian buffer
              zone.

           c) maintaining wildlife corridors along watercourses and drainage lines for native fauna movement –
              there will be no structures, fencing or other barriers established within the proposed riparian buffer
              area that would interfere with the movement of native fauna.

           d) avoiding edge effects and incompatible uses in riparian zones – the proposed riparian buffer will
              not introduce edge effects or incompatible uses to the Burgess Creek riparian zone and in that
              respect it is noted that:

                       -     the Site has been used for residential purposes for a period of approximately 30 years;
                             and
                       -     the outdoor recreational area associated with one of the existing dwellings on the Site is
                             located less than 50m from the top bank of Burgess Creek.

           e) maintaining bank stability by minimising bank erosion and slumping – the proposed vegetated
              riparian buffer to Burgess Creek will be sufficient to maintain the stability to the banks of this low
              energy coastal waterway.

           f)    maintaining water quality by filtering sediments, nutrients and other pollutants – the proposed
                 development does not rely on the riparian buffer areas for the filtering of sediments, nutrients and
                 other pollutants. It is also relevant to note that Burgess Creek receives outflows of treated effluent
                 from the Noosa wastewater treatment plant and as such is not a pristine waterway.

           g) removing undesirable plant species and replacing them with vegetation of local origin – the 50m
              wide riparian buffer area will be the subject of:

                       -     a comprehensive program of rehabilitation works that will involve the removal of existing
                             infestations of non-native plant species and their replacement with native plant species;
                             and
                       -     a statutory Environmental Covenant that will require existing and future land owners to
                             appropriately manage weed species and indigenous vegetation within the riparian buffer
                             area, as detailed in Vegetation Management Plan – Operational Phase - Plan Ref
                             WE17035-OVMP-001-002 presented in Annexure B.


UXO

The site is located in an area with substantial potential for UXO. The development will increase the
amount of people living in a UXO area. UXO assessment and UXO rehabilitation can lead to clearing
protected vegetation.

Information Required

5.         Provide further information regarding the UXO clearances required and the amount of
           vegetation clearing necessary to render the site safe.

UXO clearances will be undertaken prior to the commencement of civil engineering works and will involve
vegetation clearance. The nature of vegetation clearance works required across the Site will vary depending
the nature of the approved uses for different sectors of the Site.

Within those parts of the Site approved to be developed for residential purposes (i.e. building envelopes,
access driveways and service corridors) the majority of existing vegetation will require removal to enable
detailed UXO inspections to be completed using ground penetrating equipment capable of detecting the


I:\WE Jobs 2017\WE17035 - Castaways Beach\wp\IR Response\Ecology and Bushfire NSC IR Response V1.docx
Log in to download the original file

ATTCH 2 - IR Response - Ecological and Bushfire IR Response (Cardno).pdf · 15.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.