Original source · versioned page text
Stevens Gerber Submission MCU 15 0095 115 Eumundi Noosa Road
Attached to the e-mail MCUI15/0095 & REC15/0022 PM Submissions Object- Principal Tracy Stevens & Others.
Specific Outcome of Code Applicant’s Assessment Submitter’s Assessment
existing infrastructure; GSLC.
O7 Sufficient carparking is provided O7 Complies Does not Comply
to accommodate the number and The proposed development The DA does not comply with the probable
type of vehicles likely to be will provide 10 car parking solution. It is the responsibility of the
generated by the development spaces. Technically this is applicant to demonstrate how alternative
having regard to the specifics of the below the minimum solutions achieve the outcomes and purpose
use… according to Table 14-51 of the codes. The applicant has not satisfied
Vehicle Parking this criteria as sufficient details have not
Requirements. However, it is been provided as to how the DA achieves this
considered that 10 spaces specific outcome.
are suitable given the
ancillary nature of the
proposed petrol building. The
likely number of users of the
service will be there to refuel
their vehicles, which
comprises leaving the vehicle
at the fuel dispenser. The
amount of users specifically
using the site for the ancillary
shop component is
considered to be low. It is
there considered that 10
spaces is appropriate.
O9 Parking areas are located where O9 Complies Does not Comply
they will not unduly conflict with Car parking is located at the It is the applicant’s responsibility to establish
pedestrians and will not dominate front of the building, the how the DA complies with the Code. The
the streetscape. most suitable location for a applicant has not satisfied this criteria as no
service station use. details have been provided as to how the DA
achieves this specific outcome of parking
location not conflicting with pedestrians and
not dominating streetscape.
O11 Access and egress points do not S11.1 Complies Does not Comply
impact on the safety and operations Given the nature of the development and
of the road system proximity to the GSLC the proposed access
and egress point impact adversely on the
safety and operation of the Eumundi-Noosa
Road.
O14 Provision is made for pedestrian O14 Complies Does not Comply
and vehicular queues at conflict Can comply via condition It is the applicant’s responsibility to establish
points; where applicable. how the DA complies with the Code. The
applicant has not satisfied this criterion as no
details have been provided as to how the DA
35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original