Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Stevens Gerber Submission MCU 15 0095 115 Eumundi Noosa Road

Attached to the e-mail MCUI15/0095 & REC15/0022 PM Submissions Object- Principal Tracy Stevens & Others.

of 37

Page text shows just the words. Original shows the document exactly as it was published.

                     a 2.5m high fence along part of the boundary between the site and the GSLC
                      open air pool..


30.      The proposed operation hours of the service station are stated as being 24 hours 7
         days a week.

31.      There will be an estimated trip generation of 129 trips (entry and exit) in the peak
         hour4.

             GSLC - adjoining land user

32.      The site is currently a vacant block and adjoins GSLC, an educational facility of
         approximately 900 students from prep to year 12.

33.      In particular, the site directly adjoins the GSLC 14 metre outdoor toddler pool. The
         GSLC 25 metre outdoor pool is next to the toddler pool. There is no fence or other
         solid structure between the boundary of the site and the toddler pool. The pool
         facility, apart from constant school use, is utilised all year round by Diamond Swim
         (GSLC’s Swim School). The pool facility is open for training and /or use from 5.30am to
         7.30pm and teaches babies from 8 weeks of age. The pool facility is also available for
         the public to hire.

34.      The site also adjoins the GSLC music rooms and HPE Centre, which is used
         continuously by the school. The HPE Centre is also available for external hire,
         including basketball, netball, indoor soccer, volleyball, badminton and major
         functions. In addition, the EFM Health Club, Noosaville operates out of the upper
         floor of the HPE Centre, which is open for use between the hours of 6am to 7.30pm.

35.      The HPE Centre has a series of high level air intake louvers facing the site. (See
         photograph below). If the service station proceeds and the “vapour wall” is
         constructed, there is nothing to prevent the emissions going over the barrier and
         through the HPE Centre louvers and into the HPE Centre. Even though the vapours
         are heavier than air, if the wind is from the west or south west, it will blow the
         emissions towards the pool and HPE Centre.




4
    Section 4 of the Q Traffic Report.
                                                                                              8
Log in to download the original file

Stevens Gerber Submission MCU 15 0095 115 Eumundi Noosa Road.pdf · 933 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.