Council archive · source document
RFI - Attachment 7 - Response to Sustainable Building Design Code · MCU22/0094
COMPLIANCE
PERFORMANCE OUTCOME ACCEPTABLE OUTCOME RESPONSE
ü/û/NA
heat island impacts near areas of high impervious
surfaces.
Please refer to the lodged Appendix B – Architectural Design
Response and Attachment 1 of the Information Request
Response material - amended Architectural Plans for further
detailed design.
Water Efficiency and Stormwater Management
PO2 AO2.1 Not Applicable
Development maximises water efficiency on If for accommodation activities, a minimum The proposed development is for a Childcare Centre which is
site by incorporating rainwater collection 3,000 litres of rain water storage is provided per
NA classified as a Community Activity in accordance with the
and reuse measures for non-potable dwelling and reused for non-potable purposes Noosa Plan 2020.
purposes such as irrigation. and incorporated into a stormwater
management plan for the development.
AO2.2 Complies with AO2.2
With the exception of accommodation A Stormwater Management Plan was prepared for the
activities, rain water storage sufficient for the development, ensuring the implementation of appropriate
intended use is captured and used on-site for stormwater quantity and quality controls and sustainable on-
non-potable purposes and incorporated into a site water capture and collection. The development
stormwater management plan for the incorporates a bioretention basin which will capture
development. stormwater runoff and will be further discharged to the
external stormwater network.
Editor’s note—The Queensland Development Code
ü Additional stormwater will be collected from the roof,
includes provisions for the installation of rain water
harvested within a 1.5kL rainwater tank. The water collected
tanks and the reuse of stormwater.
within the rainwater tank will be utilised for supplying water
to the bathroom facilities. An assessment has been
undertaken and determined that for this use, in the Noosa
climate, this size water tank will provide adequate water
storage for these facilities. Please refer to Attachment 6 of
the Information Request Response material - amended
Stormwater Management Plan for further technical details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 7 - Response to Sustainable Building Design Code.pdfRelated documentApplication case desk ↗
About this file
- File size
- 40 KB (small file)
- File type
No other editions are linked here.