Council archive · source document
RFI - Attachment 7 - Response to Sustainable Building Design Code · MCU22/0094
COMPLIANCE
PERFORMANCE OUTCOME ACCEPTABLE OUTCOME RESPONSE
ü/û/NA
Notwithstanding, the proposed development limits
impervious surfaces to the extent possible, providing ample
landscaped outdoor play spaces and extensive site
landscaping that can take advantage of natural rainfalls.
It is noted that the landscape species selected are local native
species that do well in the Noosa environment and are self-
sustaining therefore an irrigation system is not needed.
PO3 AO3.1 Complies with AO3.1
Development reduces stormwater run-off by Development incorporates water sensitive The development incorporates a bioretention basin of which
minimising impervious areas and maximising urban design measures to manage stormwater.
involves a vegetated bed of filter material including stones,
site vegetation to absorb water on site. ü soil, native reeds, and grasses to mimic a dry creek bed. This
provides efficient stormwater quality control, removing
pollutants through filtration.
AO3.2 Complies with AO3.2
Development incorporates porous pavements Where safe to do so, pedestrian thoroughfares will be porous
on low trafficked areas such as footpaths and
to allow stormwater to penetrate the soil which allows the
car parks.
ü environment to thrive well and establish greater vegetated
heights. Further details of the various pavement treatments
Note: Porous pavements are not considered
landscaping and do not form part of the minimum are noted in the Architectural Plans and Landscape Concept
landscape requirements. Plans.
PO4 No acceptable outcome provided. Complies with PO4
Development limits changes and disturbances Lot 4 has recently been subdivided and is relatively flat in
to the site topography to preserve existing nature as such, does not require significant cut and fill to
drainage channels as much as possible. ü support the proposed Childcare Centre development. There
is a minor slope on the site from north-east down to the
southwest corner, where a small amount of retaining and
earthworks will be provided. These works are minor in nature
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 7 - Response to Sustainable Building Design Code.pdfRelated documentApplication case desk ↗
About this file
- File size
- 40 KB (small file)
- File type
No other editions are linked here.