06/402 SUPERSEDED Decision Notice [As Published] · 132006.402

of 15

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  5 of 15


      Stormwater Drainage
25.   All stormwater drainage shall be collected on site and discharged so there is no net increase in
      stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
      to Council’s kerb & channel street drainage system in Peregian Esplanade. Plans of the drainage design
      shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining
      a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second.
26.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 3000 litres per dwelling) that is installed to ensure water from the tank can be used for external
      uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to
      be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system.

27.   To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
      from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
      down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
      Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through a single
      underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
      shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme for the
      development and a copy of this shall be provided for Council’s records prior to commencement of the
      approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
28.   All site stormwater drainage shall be by means of a gravity system.
      Sewer Mains
29.   The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

30.   The existing sewer manhole that is located in the adjoining property at the rear of the site and the ‘zone of
      influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
      finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
      all plans submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
      damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
      exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ and as
      such the applicant shall amend Operational Works plans including Building plans to ensure compliance.
      Town Water Supply
31.   The site shall be connected to Council’s existing town water supply and be constructed in accordance with
      Council’s standards and requirements at no cost to Council.

32.   Each water connection to the water reticulation system shall extend to the property boundary and be
      metered. Where multiple units are served by a single service, multiple water meters to each individual
      unit shall be installed. All fees for the supply of water meters shall be paid to the Council.
      Headworks Contributions
33.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
      on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
      the rates applicable at the time of payment. An estimate only of the contribution rates under the current
      policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
      All Groups Brisbane from March 2006 until the date of payment.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_402 SUPERSEDED Decision Notice [As Published].pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.