Decision Notice - Approved by Delegation of Authority - OPW26 0058 (As Published)

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                        Officer:            Daniel Epps
                                                                                        Direct Telephone:   07 5329 6245
                                                                                        Our Reference:      OPW26/0058
                                                                                        Your Reference:     .

               22 July 2026


               Chris Smith Constructions Pty Ltd
               PO Box 2258
               NOOSA HEADS QLD 4567
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 17 July 2026, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              OPW26/0058

                   Street address:              33 Ross Cres, Sunshine Beach Qld 4567

                   Real property description:   Lot 6 RP 216711

                   Planning Scheme:             Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                 PO Box 141
               noosa.qld.gov.au                                                            Tewantin QLD 4565
               [email protected]                                                            07 5329 6500
                                                                                                       Page 1 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
%9 NOOSA
@®& Council

Officer: Daniel Epps
Direct Telephone: 07 5329 6245
Our Reference: OPW26/0058
Your Reference:

22 July 2026

Chris Smith Constructions Pty Ltd
PO Box 2258
NOOSA HEADS QLD 4567

[email protected]

Dear Sir/Madam,

Decision Notice
Planning Act 2016

| refer to your application and advise that on 17 July 2026, Council decided to approve the
application, subject to conditions.

Details of the decision are as follows:

1. APPLICATION DETAILS

Application No: OPW26/0058
Street address: 33 Ross Cres, Sunshine Beach Qld 4567
Real property description: Lot 6 RP 216711

Planning Scheme: Noosa Plan 2020 (20 March 2026)

2. DECISION DETAILS

Council decided to issue the following type of approval:

e Development Permit for Operational Works - Vehicle Crossover
3. CURRENCY PERIOD OF APPROVAL

The currency period for this development approval is stated in the conditions below.

 

ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500

Document Set ID: 25000606 Page 1 of 7

Version: 3, Version Date: 22/07/2026
Log in to download the original file

Decision Notice - Approved by Delegation of Authority - OPW26 0058 (As Published).pdf · 152 KB (small file)

Full text of the other 6 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.           Rev.   Plan/Document Name                                     Date

                        S24-043-SW01       -      Preliminary Stormwater Management Plan Sheet 1 April 2024
                                                  of 2, prepared by Westera Partners
                                                  Annotated by Council

                        S24-043-SW02       -      Preliminary Stormwater Management Plan Sheet 2 July 2022
                                                  of 2, prepared by Westera Partners
                                                  Annotated by Council

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by, unless an application to extend the currency period is approved by
                      Council.
               SITE SPECIFIC CONDITIONS
                      Bonds
               3.     A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
                      start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               GENERAL CONDITIONS
                      Engineering
               5.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to Council at the prestart meeting.
               6.     The principal contractor must have all the appropriate insurance and public liability
                      documentation to carry out the works. The principal contractor is also responsible to ensure
                      that any subcontractors also have the appropriate insurance and public liability
                      documentation. Certificates demonstrating currency of public liability insurance and works
                      insurance covering the works must be submitted to Council prior to the prestart meeting.




                                                                                                        Page 2 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS

1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.

Plan No. Rev. Plan/Document Name Date

$24-043-SW01 Preliminary Stormwater Management Plan Sheet 1 | April 2024

of 2, prepared by Westera Partners
Annotated by Council

$24-043-SW02 Preliminary Stormwater Management Plan Sheet 2 | July 2022

of 2, prepared by Westera Partners
Annotated by Council

CURRENCY PERIOD

2. | The Currency Period for this development approval lapses if the development has not
substantially started by, unless an application to extend the currency period is approved by
Council.

SITE SPECIFIC CONDITIONS
Bonds

3. Asite control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.

The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.

4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.

Cc. be requested for release by writing to Council, when relevant approval requirements
have been met.

GENERAL CONDITIONS
Engineering

5.  Acondition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.

6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and_ public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.

Document Set ID: 25000606 Page 2 of 7

Version: 3, Version Date: 22/07/2026

Page 3

               7.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works; and
               8.     A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               9.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               10.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               11.    The integrity and condition of any existing public or Council infrastructure and services
                      (above ground and/or underground) must not be adversely affected by the proposed works
               12.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               13.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      the approved plans/documents and conditions detailed in this Decision Notice;
                      b.      all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                     Works within Road Reserves
               14.    No removal of street trees is permitted without Council’s prior written approval.
               15.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               16.    All works must match neatly with existing road and verge/footpath features. Additional works
                      beyond the frontage may be required to provide an acceptable transition to existing road and
                      verge/footpath profiles.
                     Driveways
               17.    Driveway crossovers must be constructed generally in accordance Council’s Standard
                      Drawings RS-049 and RS-050.




                                                                                                          Page 3 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
7. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:

a. Civil engineering works; and

8. | AConstruction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:

a. Traffic management during all phases of construction;
b. | Adequate parking arrangements for works and deliveries;

Cc. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and

d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.

9. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.

10. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.

DURING CONSTRUCTION
Engineering

11. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works

12. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.

13. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice;

b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and

Cc. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.

Works within Road Reserves
14. Noremoval of street trees is permitted without Council’s prior written approval.

15. Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.

16. All works must match neatly with existing road and verge/footpath features. Additional works
beyond the frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.

Driveways

17. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-049 and RS-050.

Document Set ID: 25000606 Page 3 of 7

Version: 3, Version Date: 22/07/2026

Page 4

               18.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               19.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
                              or patterned/plain concrete;
                      b.      the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
                              Parking for longitudinal and crossfall gradients;
                      c.      the driveway must be constructed so as to not concentrate or direct stormwater runoff
                              onto neighbouring properties;
                      d.      underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway;
                      e.      where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path;
                      f.      have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
                              unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
                              to Council;
                      g.      any stormwater kerb outlet in close proximity to the edge of the new driveway must be
                              provided with an approved kerb adaptor; and
                      h.      any existing kerb sections requiring removal due to the works must be saw-cut and
                              removed to allow for a smooth and neat finish with the new driveway.
               20.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer.
                      Stormwater Drainage
               21.    The constructed driveway must not cause additional ponding on the road formation or the
                      road reserve.
               22.    Any proposed surface drainage grate must be located wholly within private property.
                      Environment (Erosion and Sediment Control)
               23.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
                      not be released from the site or to waters within the site, or be likely to be released should
                      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
                      minimise the release and concentration of contamination.
               24.    The contractor must ensure non-essential exposure of soil is prevented by restricting the
                      extent of works and minimising the duration of soil exposure to adverse weather conditions.
                      Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and
                      prior to any predicted rainfall occurring.
               25.    Erosion and sediment control measures must be installed and maintained to minimise
                      erosion on the site and to minimise the export of sediment and associated pollutants from
                      the site. The erosion and sediment control measures must be designed, installed and
                      maintained in accordance with current best practice standards (refer to advisory notes).
               FOLLOWING CONSTRUCTION
               26.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.




                                                                                                       Page 4 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
18.

19.

20.

21.

22.

23.

24.

25.

Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.

The following must be complied with during the construction of the required
crossover/driveway:

a. the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
or patterned/plain concrete;

b. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
Parking for longitudinal and crossfall gradients;

Cc. the driveway must be constructed so as to not concentrate or direct stormwater runoff
onto neighbouring properties;

d. underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;

e. — where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path;

f. have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
to Council;

g. any stormwater kerb outlet in close proximity to the edge of the new driveway must be
provided with an approved kerb adaptor; and

h. any existing kerb sections requiring removal due to the works must be saw-cut and
removed to allow for a smooth and neat finish with the new driveway.

Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveway and car park areas will remain the
responsibility of the property owner/developer.

Stormwater Drainage

The constructed driveway must not cause additional ponding on the road formation or the
road reserve.

Any proposed surface drainage grate must be located wholly within private property.
Environment (Erosion and Sediment Control)

Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
not be released from the site or to waters within the site, or be likely to be released should
rainfall occur, unless all reasonable and practicable measures are taken to prevent or
minimise the release and concentration of contamination.

The contractor must ensure non-essential exposure of soil is prevented by restricting the
extent of works and minimising the duration of soil exposure to adverse weather conditions.
Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and
prior to any predicted rainfall occurring.

Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants from
the site. The erosion and sediment control measures must be designed, installed and
maintained in accordance with current best practice standards (refer to advisory notes).

FOLLOWING CONSTRUCTION

26.

Document Set ID: 25000606

A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.

Page 4 of 7

Version: 3, Version Date: 22/07/2026

Page 5

               27.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the requirements of this Operational Works
                      permit.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               ADVISORY NOTES
               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawing RS-049 and
                      RS-050.
               2.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart Inspections Request
               5.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
                      It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business
                      days must have passed or the applicant must have provided Council with written confirmation
                      that the applicant has accepted the conditions of Decision Notice and waived their appeal
                      rights.
               6.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.




                                                                                                         Page 5 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
27. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the requirements of this Operational Works
permit.

5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES

Not applicable.
7. ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:

ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:

General Advisory Notes

1. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawing RS-049 and
RS-050.

2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.

3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.

4. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.

Prestart Inspections Request

5. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days’ notice of preferred inspection time.

It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business
days must have passed or the applicant must have provided Council with written confirmation
that the applicant has accepted the conditions of Decision Notice and waived their appeal
rights.

6. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.

Document Set ID: 25000606 Page 5 of 7

Version: 3, Version Date: 22/07/2026

Page 6

                      Environmental Advisory Notes
               7.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               8.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
                      Performance Bond Agreement
               9.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Building Works            All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,

               Daniel Epps
               Senior Development Engineer | Development Assessment
               Development & Regulation


               Enc:   Appeal Rights
                      Approved Plans/Documents




                                                                                                        Page 6 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
Environmental Advisory Notes

7. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.

Erosion and Sediment Control

8. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.

Performance Bond Agreement

9. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.

8. PROPERTY NOTES

Not applicable.

9. VARIATION APPROVAL DETAILS

Not applicable.

10. FURTHER DEVELOPMENT PERMITS REQUIRED

Type of Development Permit Required Subject of the required Development Permit

Development Permit for Building Works All building work.

11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.

During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.

13. OTHER DETAILS

If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Daniel Lype

Senior Development Engineer | Development Assessment
Development & Regulation

Enc: Appeal Rights
Approved Plans/Documents

Document Set ID: 25000606 Page 6 of 7

Version: 3, Version Date: 22/07/2026

Page 7

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 7 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026


[OCR of page images]
PLANNING ACT 2016 & PLANNING REGULATION 2017

wd NOOSA Appeal Rights
ar

Council

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1) Schedule 1 of the Planning Act 2016 states —
(a) Matters that may be appealed to —
(i) either a tribunal or the P&E Court; or
(ii) only a tribunal; or
(iii) only the P&E Court; and
(b) The person-
(i) who may appeal a matter (the appellant); and
(ii) who is a respondent in an appeal of the matter; and
(iii) who is a co-respondent in an appeal of the matter; and
(

iv}

who may elect to be a co-respondent in an appeal of the
matter.

(2) An appellant may start an appeal within the appeal period.
(3) The appeal period is —
(a) for an appeal by a building advisory agency — 10 business

days after a decision notice for the decision is given to the
agency; or

(b) for an appeal against a deemed refusal — at any time after the
deemed refusal happens; or

(c) for an appeal against a decision of the Minister, under chapter
7, part 4, to register premises or to renew the registration of
premises — 20 business days after a notice us published under
section 269(3)(a) or (4); or

(d) for an appeal against an infrastructure charges notice — 20
business days after the infrastructure charges notice is given
to the person; or

(e) for an appeal about a deemed approval of a development
application for which a decision notice has not been given —
30 business days after the applicant gives the deemed
approval notice to the assessment manager; or

(f) for any other appeal — 20 business days after a notice of the
decision for the matter, including an enforcement notice, is
given to the person.

Note —

See the P&E Court Act for the court's power to extend the appeal

period.

(4) Each respondent and co-respondent for an appeal may be heard
in the appeal.

(5) If an appeal is only about a referral agency's response, the
assessment manager may apply to the tribunal or P&E Court to
withdraw from the appeal.

(6) To remove any doubt. It is declared that an appeal against an
infrastructure charges notice must not be about-

(a) the adopted charge itself; or
(b) for a decision about an offset or refund-

(i) the establishment cost of trunk infrastructure identified in
aLGIP; or

(ii) the cost of infrastructure decided using the method
included in the local government's charges resolution.

230 Notice of appeal

(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that-

(a) is in the approved form; and
(b) succinctly states the grounds of the appeal.

(2) The notice of appeal must be accompanied by the required fee.

Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026

(3)

(4)

(5)

(6)

The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to —

(a) the respondent for the appeal; and
(b) each co-respondent for the appeal; and

(c) for an appeal about a development application under schedule
1, table 1, item 1 - each principal submitter for the
development application; and

(d) for and appeal about a change application under schedule 1,
table 1, item 2 - each principal submitter for the change
application; and

(e) each person who may elect to become a co-respondent for the
appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and

(f) for an appeal to the P&E Court — the chief executive; and

(g) for an appeal to a tribunal under another Act — any other
person who the registrar considers appropriate.

The service period is —

(a) if a submitter or advice agency started the appeal in the P&E
Court — 2 business days after the appeal has started; or

(b) otherwise — 10 business days after the appeal is started.

A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).

A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
appeal is given to the person.

231 Other appeals

(1)

(2)

(3)

(4)

Subject to this chapter, schedule 1 and the P&E Court Act, unless
the Supreme Court decides a decision or other matter under this
Act is affected by jurisdictional error, the decision or matter is non-
appealable.

The Judicial Review Act 1991, part 5 applies to the decision or
matter to the extent it is affected by jurisdictional error.

A person who, but for subsection (1) could have made an
application under the Judicial Review Act 1997 in relation to the
decision or matter, may apply under part 4 of that Act for a
statement of reasons in relation to the decision or matter.

In this section —
decision includes-

(a) conduct engaged in for the purpose of making a decision; and
(b) other conduct that relates to the making of a decision; and

(c) the making of a decision or failure to make a decision; and
(d) a purported decision; and

(e) adeemed refusal.

non-appealable, for a decision or matter, means the decision or
matter-

(a) is final and conclusive; and

(b) may not be challenged, appealed against, reviewed, quashed,
set aside or called into question in any other way under the
Judicial Review Act 1991 or otherwise, whether by the
Supreme Court, another court, a tribunal or another entity; and

(c) is not subject to any declaratory, injunctive or other order of
the Supreme Court, another court, a tribunal or another entity
on any ground.

232 Rules of the P&E Court

(1)

(2)

A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.

However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court

Page 7 of 7

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.