Original source · versioned page text
Decision Notice - Approved by Delegation of Authority - OPW26 0058 (As Published)
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
S24-043-SW01 - Preliminary Stormwater Management Plan Sheet 1 April 2024
of 2, prepared by Westera Partners
Annotated by Council
S24-043-SW02 - Preliminary Stormwater Management Plan Sheet 2 July 2022
of 2, prepared by Westera Partners
Annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by, unless an application to extend the currency period is approved by
Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
GENERAL CONDITIONS
Engineering
5. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
Page 2 of 7
Document Set ID: 25000606
Version: 3, Version Date: 22/07/2026
[OCR of page images]
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
$24-043-SW01 Preliminary Stormwater Management Plan Sheet 1 | April 2024
of 2, prepared by Westera Partners
Annotated by Council
$24-043-SW02 Preliminary Stormwater Management Plan Sheet 2 | July 2022
of 2, prepared by Westera Partners
Annotated by Council
CURRENCY PERIOD
2. | The Currency Period for this development approval lapses if the development has not
substantially started by, unless an application to extend the currency period is approved by
Council.
SITE SPECIFIC CONDITIONS
Bonds
3. Asite control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
Cc. be requested for release by writing to Council, when relevant approval requirements
have been met.
GENERAL CONDITIONS
Engineering
5. Acondition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and_ public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
Document Set ID: 25000606 Page 2 of 7
Version: 3, Version Date: 22/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original