NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 10
19. The existing water meters shall be relocated and disconnected where necessary to suit the approved lot
layout. The works shall be undertaken by Council at the applicant’s cost to facilitate compliance with
Council’s Planning Scheme Policy PSP06 – Engineering Design Standards – Water and Sewerage.
Water meters shall be located on opposite boundaries to Energex pillar boxes.
Sewer
20. Prior to Council endorsement of the Plan of Survey, the applicant shall submit to Council plans prepared
by a registered Professional Civil Engineer showing surface levels and calculations to verify existing
sewer house connections to proposed lots 2, 3 and 4 are suitably located and fully control the allotments
being served. Refer Noosa Shire Council Planning Scheme Policy 6 - Water and Sewerage Design
Standards.
21. The existing sewer within easements A and C in proposed lot 1 shall be modified such that the sewer
terminates in a manhole immediately south of the northern side of Easement E. All works are to comply
with Noosa Shire Council Planning Scheme Policy PSP06 – Engineering Design Standards – Water and
Sewerage.
An Operational Works - Sewer reticulation application must be submitted in respect to sewerage
modification works.
22. Detailed design drawings and calculations shall be submitted with an application for a Development
Permit for Operation Works in respect of water or sewer works. To avoid conflict with other underground
pipes or services, all existing and proposed services required by the development shall be shown on the
plans.
23. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council.
Stormwater
24. Roof and surface water is to be collected on site and is to be discharged through a single underground
drain line into the existing drainage structures at the rear of the lots and to the reasonable satisfaction of
the Manager - Land Development. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the drainage scheme.
25. The existing stormwater pits located adjacent to the rear boundaries of the lots shall be relocated such
that a pit and connection point is available in each new lot. The works shall be designed and constructed
in accordance with the requirements of Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks, shall reference where applicable to Council’s Standard
Drawings and shall incorporate best engineering practice.
26. All site drainage shall be by means of gravity systems.
Power/Telecommunications
27. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed designs shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
(prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
lots.
28. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
new telephone services to the proposed lots. In this regard written confirmation from an approved
telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
Survey.
29. Any alteration of a public utility or other facility necessitated by the development of the land or associated
construction works either internal or external to the site shall be at no cost to Council.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001490.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 43 KB (small file)
- File type
No other editions are linked here.