NOOSA COUNCIL IDAS Development Application Decision Notice                                                    5 of 10


19.     The existing water meters shall be relocated and disconnected where necessary to suit the approved lot
        layout. The works shall be undertaken by Council at the applicant’s cost to facilitate compliance with
        Council’s Planning Scheme Policy PSP06 – Engineering Design Standards – Water and Sewerage.
        Water meters shall be located on opposite boundaries to Energex pillar boxes.



Sewer
20.     Prior to Council endorsement of the Plan of Survey, the applicant shall submit to Council plans prepared
        by a registered Professional Civil Engineer showing surface levels and calculations to verify existing
        sewer house connections to proposed lots 2, 3 and 4 are suitably located and fully control the allotments
        being served. Refer Noosa Shire Council Planning Scheme Policy 6 - Water and Sewerage Design
        Standards.

21.     The existing sewer within easements A and C in proposed lot 1 shall be modified such that the sewer
        terminates in a manhole immediately south of the northern side of Easement E. All works are to comply
        with Noosa Shire Council Planning Scheme Policy PSP06 – Engineering Design Standards – Water and
        Sewerage.
        An Operational Works - Sewer reticulation application must be submitted in respect to sewerage
        modification works.
22.     Detailed design drawings and calculations shall be submitted with an application for a Development
        Permit for Operation Works in respect of water or sewer works. To avoid conflict with other underground
        pipes or services, all existing and proposed services required by the development shall be shown on the
        plans.

23.     All connections to sewer system shall be carried out either by Council or by a Council approved
        Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council.

Stormwater

24.     Roof and surface water is to be collected on site and is to be discharged through a single underground
        drain line into the existing drainage structures at the rear of the lots and to the reasonable satisfaction of
        the Manager - Land Development. A Development Permit for Building Works shall not be granted until a
        Development Permit for Operational Works has been issued in regard to the drainage scheme.

25.     The existing stormwater pits located adjacent to the rear boundaries of the lots shall be relocated such
        that a pit and connection point is available in each new lot. The works shall be designed and constructed
        in accordance with the requirements of Council’s Planning Scheme Policy PSP05 – Engineering Design
        Standards – Roads, Drainage and Earthworks, shall reference where applicable to Council’s Standard
        Drawings and shall incorporate best engineering practice.

26.     All site drainage shall be by means of gravity systems.
Power/Telecommunications
27.     An underground electricity service shall be provided to each lot if not already provided.
        In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
        Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
        The detailed designs shall then be submitted to ENERGEX for approval and a copy of their approval
        submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
        (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
        Survey.

        Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
        the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
        lots.

28.     The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
        new telephone services to the proposed lots. In this regard written confirmation from an approved
        telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
        Survey.

29.     Any alteration of a public utility or other facility necessitated by the development of the land or associated
        construction works either internal or external to the site shall be at no cost to Council.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]

Used in these records

About this file

File size
43 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001490.001 [As Published].pdf · 43 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.