NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 10
Security
38. Prior to commencement of any operational works arising out of this permit, security in the sum of $5,000
must be lodged with Noosa Council, to secure performance of all conditions of this permit. The security
shall be in the form of cash or unconditional trading bank guarantee acceptable to the Manager - Land
Development.
The security will be returned upon satisfactory performance of all the conditions of this permit and any
other related development permits for operational works, less any costs incurred by Council in ensuring
compliance with these conditions or for any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
General
39. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particulate matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
40. A programme of works is to be submitted with any application for any Development Permit for Operational
Works detailing the construction schedule and proposed environmental protection measures.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be
submitted to Council’s Works Inspector within seven (7) days.
41. Operational works shall be carried out in a manner that prevents:-
41.1. Pollution of a waterway
41.2. Dust/sand nuisance to residents in the vicinity
41.3. Transfer of dirt and debris onto a public road
41.4. Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries)
41.5. Excessive traffic delays (less than 5 minute delays)
41.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of
construction equipment etc.)
42. Where operational works are likely to affect nearby residents, at least 3 days notice of commencement of
work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to
affected residents.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001490.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 43 KB (small file)
- File type
No other editions are linked here.